TEXAS · WELLS · LEON COUNTY · API 42-289-80011 · DISTRICT 05
Harris T.O. Heirs #2
Leon County · Wildcat field · Vertical
Harris T.O. Heirs #2 (API 42-289-80011) is a plugged well in Leon County, plugged September 12, 1995, last operated by Valence Operating Company.
The RRC has issued one drilling permit, issued February 19, 1993, permitted to 5,600 ft.
Completion filings report 4 formation tops, including Nacotoch, Pecan Gap, Austin Chalk, Woodbine.
Operator of record
- Based in
- Kingwood, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jun 4, 2026
- Permits on file
- 990
- Phone
- (281) 359-3659
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Valence Operating Company |
| Production reports | none |
| Latest permit | Valence Operating CompanyFeb 19, 1993 |
- 5,600
- total depth, ft
- 1
- permits on file
- Feb 19, 1993
- last permit issued
- Mar 4, 1993
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 1995
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 4, 1993
- Shut in
- —
- Plugged
- Sep 12, 1995
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Harris, T. O., Heirs G-5-15514 | Oakwood (Woodbine) | Valence Operating Company | 1 | 0 | 0 | Jan 1993 – Dec 1995 |
| Harris, T.O. Heirs G-5-146471 | Wildcat | Valence Operating Company | 1 | 0 | 0 | Mar 1993 – Sep 1995 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 408926-99 | Recompletion | Valence Operating Company | Feb 12, 1993 | Feb 19, 1993 | Feb 2, 1993 | 5,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Mar 4, 1993 | Harris T.O. Heirs G-5-146471 | Wildcat | Valence Operating Company | Plugged | — |
| Jan 9, 1946 | Harris T. O. Heirs G-5-15514 | Oakwood (Woodbine) | Valence Operating Company | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 269 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Nacotoch | 3,605 | -3,336 |
| Pecan Gap | 4,165 | -3,896 |
| Austin ChalkBASE AUSTIN CHALK | 5,575 | -5,306 |
| WoodbineTOP WOODBINE | 5,810 | -5,541 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,468 | 5,474 | Perforated |
| 5,857 | 5,867 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 110 | 17.5 | 180 S |
| 9.625 | 2,365 | 12.25 | 900 S |
| 5.5 | 5,892 | 8.625 | 325 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 20, 1993 | Aug 9, 1993 | Yes |
| 00 | Sep 14, 1993 | — | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-289-80011 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-289-80011 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- Mar 1995
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000078072 | H-1 Injection | Plugged Oct 12, 1995 | 3,000 | 0 | 5,753–5,850 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28980011, documented in the API reference.