TEXAS · WELLS · LIBERTY COUNTY · CHAMPION INTERNATIONAL CORP. LEASE · API 42-291-32211 · DISTRICT 03
Champion International Corp. #1A
Liberty County · Hathaway E. (Yegua EY-3) field · Vertical
Champion International Corp. #1A (API 42-291-32211) is a plugged well in Liberty County, plugged June 26, 2014, last operated by Ballard Exploration Company Inc..
The RRC has issued 2 drilling permits between 1994 and 1998, permitted to 11,300 ft.
Completion filings report 4 formation tops, including Frio, Yegua, Ey-3 Sand, Ey-4 Sand.
Operator of record
Ballard Exploration Company Inc.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Mar 4, 2026
- Permits on file
- 464
- Phone
- (713) 651-0181
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Ballard Exploration Company Inc. |
| Production reports | Ballard Exploration Company,inc.through Apr 2014 |
| Latest permit | Ballard Exploration Company,inc.Jul 15, 1998 |
- 11,300
- total depth, ft
- 2
- permits on file
- Jul 15, 1998
- last permit issued
- Jun 22, 1998
- completed
- 0
- cumulative oil, bbl
- 3.08M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 1994 THROUGH Jun 2015
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 22, 1998
- Shut in
- —
- Plugged
- Jun 26, 2014
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Champion International Corp. G-3-152481 | Hathaway, E. (Yegua EY-3) | Ballard Exploration Company,inc. | 1 | 0 | 3.08M | Dec 1994 – Jun 2015 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Ballard Exploration Company,inc.Dec 1994 → Apr 2014
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 477969-99 | Recompletion | Ballard Exploration Company,inc. | Jul 15, 1998 | Jul 15, 1998 | Jun 12, 1998 | 10,520 |
| 427585-99 | Drill | Ballard Exploration Company,inc. | Aug 31, 1994 | Aug 31, 1994 | Nov 22, 1994 | 11,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jun 22, 1998 | Champion International Corp. G-3-152481 | Hathaway E. (Yegua EY-3) | Ballard Exploration Company Inc. | Plugged | — |
| Jun 22, 1998 | Champion International Corp. G-3-152481 | Hathaway E. (Yegua EY-3) | Ballard Exploration Company Inc. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 45 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,105 | 10,112 | Perforated |
| 10,328 | 10,333 | Perforated |
| 10,340 | 10,354 | Perforated |
| 10,340 | 10,364 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 3,500 | 12.25 | — |
| 5.5 | 10,510 | 8.75 | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 20, 1998 | Jun 15, 1998 | Yes |
| 00 | Jul 7, 1997 | Jun 23, 1997 | — |
| 00 | Feb 27, 1995 | Jan 5, 1995 | Yes |
| 00 | Feb 1, 1995 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-291-32211 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-291-32211 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/29132211, documented in the API reference.