WELL · 42-293-30422 · DISTRICT 5

Easterling #1

Y

Limestone County · Personville N (CV Consolidated) field · Producing  · Vertical

Easterling #1 (API 42-293-30422) is a well in Limestone County operated by Hilcorp Energy Company, completed December 21, 1978 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued July 19, 1978, permitted to 13,000 ft.

It was permitted by Texas Oil & Gas Corp. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 23 formation tops, including Midway, Wilcox, Navarro, Pecan Gap.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by Texas Oil & Gas Corp.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitTexas Oil & Gas Corp.Jul 19, 1978

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,000
total depth, ft
1
permits on file
Jul 19, 1978
last permit issued
Dec 21, 1978
completed
0
cumulative oil, bbl
490K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 21, 1978
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Easterling G-5-81248Personville, N (CV Consolidated)Hilcorp Energy Company10490KJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 6,116 · prior 12 4,523(+35%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Marathon Oil CompanyJan 1993 → Apr 2002
  2. 2XTO Energy Inc.May 2002 → Dec 2023
  3. 3Hilcorp Energy CompanyJan 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
28731-99DrillTexas Oil & Gas Corp.Jul 19, 1978Jul 19, 1978Sep 24, 197813,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-81248————

Formation tops

As filed on W-2/G-1. Subsea from 496 ft elevation.Download CSV →

FormationMD ftSubsea
Midway45046
Wilcox45046
Navarro1,220-724
Pecan Gap1,485-989
Austin ChalkAUSTIN2,512-2,016
Bac3,310-2,814
Bac3,800-3,304
Eagle FordEAGLEFORD M'KER3,850-3,354
Woodbine4,190-3,694
Buda4,593-4,097
Georgetown4,625-4,129
Ft. Worth4,708-4,212
Duck Creek5,025-4,529
Edwards5,192-4,696
Paluxy5,523-5,027
Glen RoseUPPER GLEN ROSE5,726-5,230
Mass Anhydrite6,625-6,129
BMA6,737-6,241
James LimeJAMES7,204-6,708
Pine Island7,292-6,796
Pettit7,344-6,848
Travis Peak7,554-7,058
Cotton ValleyCOTTON VALLEY SD9,437-8,941
Bossier10,382-9,886
Cotton ValleyCOTTON VALLEY LM11,338-10,842

Perforations

Perforated and open-hole intervals.

FromToType
11,62811,676Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37571208 S
9.6254,66012.252,000 S
5.511,8088.751,500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Feb 26, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29330422, documented in the API reference.