TEXAS · WELLS · LIMESTONE COUNTY · JOBE #1 LEASE · API 42-293-30727 · DISTRICT 05

Jobe #1 #2

Plugged

Limestone County · Personville N (CV Consolidated) field  · Vertical

Jobe #1 #2 (API 42-293-30727) is a plugged well in Limestone County, plugged September 13, 2018, last operated by Legacy Reserves Operating LP.

The RRC has issued one drilling permit, issued March 16, 1984, permitted to 12,700 ft.

It was permitted by Txo Production Corp. and has since transferred to Legacy Reserves Operating LP on the wellbore schedule.

Completion filings report 8 formation tops, including Austin Chalk, Sub-Clarksville, Buda, Glen Rose.

Its lease has reported 10 barrels of oil and 5.44K mcf of gas since January 1993, with no volume in the three years through April 2026.

Operator of record

Legacy Reserves Operating LP

Permitted by TXO Production Corp.; the EWA schedule now lists a different operator.

Based in
Denver, CO
P-5 status
Inactive (I)
P-5 last filed
May 19, 2025
Permits on file
439
Phone
(720) 244-4898

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLegacy Reserves Operating LP
Production reportsLegacy Reserves Operating LPthrough Feb 1993
Latest permitTXO Production Corp.Mar 16, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,700
total depth, ft
1
permits on file
Mar 16, 1984
last permit issued
Jun 28, 1984
completed
10
cumulative oil, bbl
5.44K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 1993

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 28, 1984
Shut in
—
Plugged
Sep 13, 2018

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jobe #1 G-5-113283Personville, N (CV Consolidated)Legacy Reserves Operating LP1105.44KJan 1993 – Feb 1993

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Marathon Oil CompanyJan 1993 → Feb 1993

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
232641-99DrillTXO Production Corp.Mar 8, 1984Mar 16, 1984May 24, 198412,700

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 28, 1984Jobe #1 G-5-113283Personville N (CV Consolidated)Legacy Reserves Operating LPPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 438 ft elevation.Download CSV →

FormationMD ftSubsea
Austin ChalkBASE AUSTIN CHALK3,776-3,338
Sub-Clarksville3,815-3,377
Buda4,349-3,911
Glen Rose5,483-5,045
Rodessa6,485-6,047
Travis Peak7,330-6,892
Bossier10,175-9,737
Cotton ValleyCOTTON VALLEY LIME11,059-10,621

Perforations

Perforated and open-hole intervals.

FromToType
11,08211,138Perforated
11,14211,166Perforated
11,22111,226Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1660208 S
8.6254,920111,225 S
5.511,4257.8751,280 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Nov 12, 1984Oct 23, 1984—
00Nov 8, 1984Oct 17, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29330727, documented in the API reference.