TEXAS · WELLS · LIMESTONE COUNTY · API 42-293-30930 · DISTRICT 05
Beachcomber Gas Unit No. 1 #2
Limestone County · Farrar (Travis Peak) field · Vertical
Beachcomber Gas Unit NO. 1 #2 (API 42-293-30930) is a plugged well in Limestone County, plugged June 23, 2023, last operated by Xto Energy Inc..
The RRC has issued 3 drilling permits (amended twice) between 1990 and 2012, permitted to 9,800 ft.
Completion filings report 4 formation tops, including Rodessa, James Lime, Pettit, Travis Peak.
Operator of record
- Based in
- Spring, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Apr 8, 2026
- Permits on file
- 16,156
- Phone
- (346) 502-1572
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | XTO Energy Inc.through May 2023 |
| Latest permit | XTO Energy Inc.Aug 21, 2012 |
- 9,800
- total depth, ft
- 5
- permits on file
- Aug 21, 2012
- last permit issued
- Oct 25, 2011
- completed
- 0
- cumulative oil, bbl
- 1.06M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2023
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 25, 2011
- Shut in
- —
- Plugged
- Jun 23, 2023
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Beachcomber Gas Unit No. 1 G-5-135153 | Farrar (Travis Peak) | XTO Energy Inc. | 1 | 0 | 1.06M | Jan 1993 – May 2023 |
| Beachcomber Gas Unit No. 1 G-5-266241 | Farrar, SE (Pettit) | XTO Energy Inc. | 1 | 0 | 0 | Oct 2011 – May 2023 |
Gas, mcf lease total
Last 12 months 0 · prior 12 0
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Herd Producing Company, Inc.Jan 1993 → Dec 2000
- 2Cross Timbers Operating CompanyJan 2001 → May 2001
- 3XTO Energy Inc.Jun 2001 → May 2023
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 745377-99 | Recompletion | XTO Energy Inc. | Jul 26, 2012 | Aug 21, 2012 | — | 9,800 |
| 692789-99 | Recompletion | XTO Energy Inc. | Mar 12, 2010 | Mar 23, 2010 | Apr 19, 2010 | 9,717 |
| 372394-97 | Drill | Herd Producing Company, Inc. | May 8, 1990 | Apr 19, 1990 | May 9, 1990 | 9,800 |
| 372394-98 | Drill | Herd Producing Company, Inc. | May 3, 1990 | Apr 19, 1990 | — | 9,800 |
| 372394-99 | Drill | Herd Producing Company, Inc. | Apr 19, 1990 | Apr 19, 1990 | — | 9,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Oct 25, 2011 | Beachcomber Gas Unit No. 1 G-5-266241 | Farrar SE (Pettit) | XTO Energy Inc. | Plugged | — |
| Oct 25, 2011 | Beachcomber Gas Unit No. 1 G-5-135153 | Farrar (Travis Peak) | XTO Energy Inc. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 460 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Rodessa | 7,822 | -7,362 |
| James Lime | 8,352 | -7,892 |
| PettitPETTET | 8,527 | -8,067 |
| Pettit | 8,527 | -8,067 |
| Travis Peak | 8,866 | -8,406 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,587 | 8,658 | Perforated |
| 8,894 | 8,921 | Perforated |
| 8,994 | 9,002 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,250 | 11 | 325 S |
| 4.5 | 9,717 | 7.875 | 1,265 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 28, 2013 | Jun 28, 2012 | — |
| 00 | Feb 21, 2013 | Jun 28, 2012 | — |
| 00 | Jul 27, 1990 | Jul 12, 1990 | Yes |
| 00 | Jul 18, 1990 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-293-30930 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-293-30930 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/29330930, documented in the API reference.