TEXAS · WELLS · LIMESTONE COUNTY · API 42-293-30930 · DISTRICT 05

Beachcomber Gas Unit No. 1 #2

Plugged

Limestone County · Farrar (Travis Peak) field  · Vertical

Beachcomber Gas Unit NO. 1 #2 (API 42-293-30930) is a plugged well in Limestone County, plugged June 23, 2023, last operated by Xto Energy Inc..

The RRC has issued 3 drilling permits (amended twice) between 1990 and 2012, permitted to 9,800 ft.

Completion filings report 4 formation tops, including Rodessa, James Lime, Pettit, Travis Peak.

Operator of record

XTO Energy Inc.

Based in
Spring, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
16,156
Phone
(346) 502-1572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsXTO Energy Inc.through May 2023
Latest permitXTO Energy Inc.Aug 21, 2012
9,800
total depth, ft
5
permits on file
Aug 21, 2012
last permit issued
Oct 25, 2011
completed
0
cumulative oil, bbl
1.06M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2023

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 25, 2011
Shut in
—
Plugged
Jun 23, 2023

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Beachcomber Gas Unit No. 1 G-5-135153Farrar (Travis Peak)XTO Energy Inc.101.06MJan 1993 – May 2023
Beachcomber Gas Unit No. 1 G-5-266241Farrar, SE (Pettit)XTO Energy Inc.100Oct 2011 – May 2023

Gas, mcf lease total

Last 12 months 0 · prior 12 0

051015202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Herd Producing Company, Inc.Jan 1993 → Dec 2000
  2. 2Cross Timbers Operating CompanyJan 2001 → May 2001
  3. 3XTO Energy Inc.Jun 2001 → May 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
745377-99RecompletionXTO Energy Inc.Jul 26, 2012Aug 21, 2012—9,800
692789-99RecompletionXTO Energy Inc.Mar 12, 2010Mar 23, 2010Apr 19, 20109,717
372394-97DrillHerd Producing Company, Inc.May 8, 1990Apr 19, 1990May 9, 19909,800
372394-98DrillHerd Producing Company, Inc.May 3, 1990Apr 19, 1990—9,800
372394-99DrillHerd Producing Company, Inc.Apr 19, 1990Apr 19, 1990—9,800

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 25, 2011Beachcomber Gas Unit No. 1 G-5-266241Farrar SE (Pettit)XTO Energy Inc.Plugged—
Oct 25, 2011Beachcomber Gas Unit No. 1 G-5-135153Farrar (Travis Peak)XTO Energy Inc.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 460 ft elevation.Download CSV →

FormationMD ftSubsea
Rodessa7,822-7,362
James Lime8,352-7,892
PettitPETTET8,527-8,067
Pettit8,527-8,067
Travis Peak8,866-8,406

Perforations

Perforated and open-hole intervals.

FromToType
8,5878,658Perforated
8,8948,921Perforated
8,9949,002Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,25011325 S
4.59,7177.8751,265 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 28, 2013Jun 28, 2012—
00Feb 21, 2013Jun 28, 2012—
00Jul 27, 1990Jul 12, 1990Yes
00Jul 18, 1990——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29330930, documented in the API reference.