TEXAS · WELLS · LIMESTONE COUNTY · API 42-293-30992 · DISTRICT 05
Thompson B.W. Gas Unit No. 1 #2AC
Limestone County · Farrar (Travis Peak) field · Producing · Vertical
Thompson B.W. Gas Unit NO. 1 #2AC (API 42-293-30992) is a well in Limestone County operated by Hilcorp Energy Company, completed December 22, 1998 and listed as producing on the RRC schedule.
The RRC has issued 2 drilling permits between 1992 and 1994, permitted to 9,521 ft.
It was permitted by Herd Producing Company, Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.
Completion filings report 6 formation tops, including Rodessa, James Lime, Pine Island, Pettit.
Its 2 leases have reported 7.18K barrels of oil and 2.71M mcf of gas since March 1993, last reporting volume in April 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Herd Producing Company, Inc.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Mar 27, 2026
- Permits on file
- 3,454
- Phone
- (713) 209-2400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hilcorp Energy Company |
| Production reports | Hilcorp Energy Companythrough Apr 2026 |
| Latest permit | Herd Producing Company, Inc.Mar 15, 1994 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,521
- total depth, ft
- 2
- permits on file
- Mar 15, 1994
- last permit issued
- Dec 22, 1998
- completed
- 7.18K
- cumulative oil, bbl
- 2.71M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 1993 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Dec 22, 1998
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Thompson, B.W. Gas Unit No. 1 G-5-144852 | Farrar (Travis Peak) | Hilcorp Energy Company | 1 | 6.35K | 2.34M | Mar 1993 – Apr 2026 |
| Thompson, B.W.G.U. No. 1 G-5-149592 | Farrar, SE (Pettit) | Hilcorp Energy Company | 1 | 830 | 372K | Mar 1994 – Dec 1998 |
Gas, mcf lease total
Last 12 months 467 · prior 12 768(-39%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Herd Producing Company, Inc.Mar 1993 → Dec 2000
- 2Cross Timbers Operating CompanyJan 2001 → May 2001
- 3XTO Energy Inc.Jun 2001 → Dec 2023
- 4Hilcorp Energy CompanyJan 2024 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 422061-99 | Recompletion | Herd Producing Company, Inc. | Mar 15, 1994 | Mar 15, 1994 | Mar 29, 1994 | 9,521 |
| 407337-99 | Drill | Herd Producing Company, Inc. | Dec 16, 1992 | Dec 16, 1992 | Dec 22, 1992 | 9,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Dec 22, 1998 | Thompson B.W. Gas Unit No. 1 G-5-144852 | Farrar (Travis Peak) | Hilcorp Energy Company | Producing | 9,521 |
| Mar 30, 1994 | Thompson B.W.G.U. No. 1 G-5-149592 | Farrar SE (Pettit) | Hilcorp Energy Company | SWR-10-Well · shut in Oct 1, 2000 | 9,521 |
Formation tops
As filed on W-2/G-1. Subsea from 489 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Rodessa | 7,853 | -7,364 |
| James Lime | 8,408 | -7,919 |
| Pine Island | 8,494 | -8,005 |
| Pettit | 8,566 | -8,077 |
| Transition | 8,810 | -8,321 |
| Travis Peak | 8,920 | -8,431 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,676 | 8,684 | Perforated |
| 8,980 | 9,045 | Perforated |
| 8,980 | 9,333 | Perforated |
| 9,197 | 9,332 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,260 | 11 | 358 S |
| 4.5 | 9,521 | 7.875 | 735 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 2, 1999 | Jan 14, 1999 | — |
| 00 | Jun 21, 1994 | Apr 29, 1994 | Yes |
| 00 | Jun 16, 1994 | — | — |
| 00 | May 14, 1993 | Mar 11, 1993 | Yes |
| 00 | Apr 28, 1993 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-293-30992 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-293-30992 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/29330992, documented in the API reference.