WELL · 42-293-31026 · DISTRICT 5
Stone W.O. Gas Unit No. 1 #3
Limestone County · Farrar SE (Pettit) field · Vertical
Stone W.O. Gas Unit NO. 1 #3 (API 42-293-31026) is a plugged well in Limestone County, plugged May 9, 2023, last operated by Xto Energy Inc..
The RRC has issued 2 drilling permits between 1993 and 2009, permitted to 9,516 ft.
Completion filings report 6 formation tops, including BMA, Massive Anhydrite (marker), Rodessa, Bexar.
Operator of record
- Based in
- Spring, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Apr 8, 2026
- Permits on file
- 16,156
- Phone
- (346) 502-1572
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | XTO Energy Inc. |
| Production reports | XTO Energy Inc.through Oct 2020 |
| Latest permit | XTO Energy Inc.Nov 20, 2009 |
- 9,516
- total depth, ft
- 2
- permits on file
- Nov 20, 2009
- last permit issued
- Jan 8, 2010
- completed
- 0
- cumulative oil, bbl
- 2.85M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1994 THROUGH Apr 2023
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 8, 2010
- Shut in
- —
- Plugged
- May 9, 2023
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Stone, W.O. Gas Unit No. 1 G-5-148679 | Farrar (Travis Peak) | XTO Energy Inc. | 1 | 0 | 2.85M | Jan 1994 – Apr 2023 |
| Stone, W.O. Gas Unit No. 1 G-5-255003 | Farrar, SE (Pettit) | XTO Energy Inc. | 1 | 0 | 0 | Jan 2010 – Apr 2023 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Herd Producing Company, Inc.Jan 1994 → Dec 2000
- 2Cross Timbers Operating CompanyJan 2001 → May 2001
- 3XTO Energy Inc.Jun 2001 → Oct 2020
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 687480-99 | Recompletion | XTO Energy Inc. | Nov 17, 2009 | Nov 20, 2009 | Dec 3, 2009 | 9,516 |
| 416899-99 | Drill | Herd Producing Company, Inc. | Oct 8, 1993 | Oct 11, 1993 | Nov 17, 1993 | 9,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jan 8, 2010 | Stone W.O. Gas Unit No. 1 G-5-255003 | Farrar SE (Pettit) | XTO Energy Inc. | Plugged | — |
| Jan 8, 2010 | Stone W.O. Gas Unit No. 1 G-5-148679 | Farrar (Travis Peak) | XTO Energy Inc. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 446 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| BMA | 7,776 | -7,330 |
| Massive Anhydrite (marker)MASSIVE ANHYDRITE | 7,776 | -7,330 |
| Rodessa | 7,864 | -7,418 |
| Bexar | 8,218 | -7,772 |
| Pettit | 8,502 | -8,056 |
| Travis Peak | 8,864 | -8,418 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,559 | 8,776 | Perforated |
| 8,876 | 9,054 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,168 | 11 | 390 S |
| 4.5 | 9,506 | 7.875 | 641 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 17, 2010 | Feb 22, 2010 | — |
| 00 | Mar 16, 2010 | — | — |
| 00 | Apr 20, 1994 | Feb 10, 1994 | Yes |
| 00 | Apr 8, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-293-31026 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-293-31026 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/29331026, documented in the API reference.