TEXAS · WELLS · LIMESTONE COUNTY · COX, GEORGIA GAS UNIT LEASE · API 42-293-31031 · DISTRICT 05

Cox Georgia Gas Unit #6

Y

Limestone County · Oletha (Travis Peak) field · Producing  · Vertical

Cox Georgia Gas Unit #6 (API 42-293-31031) is a well in Limestone County operated by Hilcorp Energy Company, completed May 29, 1994 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued November 1, 1993, permitted to 9,900 ft.

It was permitted by Texaco E & P Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 6 formation tops, including Austin Chalk, Woodbine, Georgetown, Glen Rose.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by Texaco E & P Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitTexaco E & P Inc.Nov 1, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,900
total depth, ft
2
permits on file
Nov 1, 1993
last permit issued
May 29, 1994
completed
0
cumulative oil, bbl
3.89M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 1994 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 29, 1994
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cox, Georgia Gas Unit G-5-150444Oletha (Travis Peak)Hilcorp Energy Company103.89MMay 1994 – Jul 2026

Gas, mcf lease total

Last 12 months 45,370 · prior 12 59,348(-24%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.May 1994 → May 2002
  2. 2Chevron U. S. A. Inc.Jun 2002 → Jul 2004
  3. 3XTO Energy Inc.Aug 2004 → Dec 2023
  4. 4Hilcorp Energy CompanyJan 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
417668-98DrillTexaco E & P Inc.Apr 8, 1994Nov 1, 1993Apr 21, 199411,000
417668-99DrillTexaco E & P Inc.Oct 29, 1993Nov 1, 1993—11,000

Completions

CompletedLeaseFieldOperatorStatusDepth
May 29, 1994Cox Georgia Gas Unit G-5-150444Oletha (Travis Peak)Hilcorp Energy CompanyProducing9,900

Formation tops

As filed on W-2/G-1. Subsea from 429 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk3,390-2,961
Woodbine4,266-3,837
Georgetown4,686-4,257
Glen Rose5,656-5,227
Rodessa6,444-6,015
Pettit7,252-6,823

Perforations

Perforated and open-hole intervals.

FromToType
7,5937,608Perforated
7,6927,706Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1660——
9.62589512.25390 S
5.59,9008.751,750 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 25, 1994Jun 27, 1994Yes
00Aug 15, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.