WELL · 42-293-31135 · DISTRICT 5
Orosz #1
Limestone County · Oletha (Travis Peak) field · Vertical
Orosz #1 (API 42-293-31135) is a plugged well in Limestone County, plugged January 27, 1998, last operated by Goodrich Petroleum Company.
The RRC has issued 2 drilling permits in 1996, permitted to 9,945 ft.
Completion filings report 6 formation tops, including B Austin Chalk, B.Austin Chalk, BMA, Pettit.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Feb 2, 2022
- Permits on file
- 696
- Phone
- (832) 399-3156
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Goodrich Petroleum Company |
| Production reports | Goodrich Petroleum Companythrough Jan 1998 |
| Latest permit | Goodrich Petroleum CompanyOct 22, 1996 |
- 9,945
- total depth, ft
- 2
- permits on file
- Oct 22, 1996
- last permit issued
- Feb 14, 1997
- completed
- 0
- cumulative oil, bbl
- 28.1K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 1996 THROUGH Jan 1998
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 14, 1997
- Shut in
- —
- Plugged
- Jan 27, 1998
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Orosz G-5-159780 | Wildcat | Goodrich Petroleum Company | 1 | 0 | 28.1K | Apr 1996 – Jan 1998 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Goodrich Petroleum CompanySep 1996 → Jan 1998
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 454153-99 | Field transfer | Goodrich Petroleum Company | Oct 18, 1996 | Oct 22, 1996 | Mar 8, 1996 | 9,945 |
| 445419-99 | Drill | Goodrich Petroleum Company | Mar 1, 1996 | Mar 1, 1996 | Mar 7, 1996 | 9,750 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-5-159780 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 442 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| B Austin Chalk | 4,015 | -3,573 |
| B.austin Chalk | 4,015 | -3,573 |
| BMA | 6,800 | -6,358 |
| Pettit | 7,422 | -6,980 |
| Travis Peak | 7,556 | -7,114 |
| Cotton Valley | 9,548 | -9,106 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,666 | 7,674 | Perforated |
| 7,682 | 7,688 | Perforated |
| 7,852 | 7,860 | Perforated |
| 9,318 | 9,380 | Perforated |
| 9,412 | 9,416 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 900 | 12.25 | 319 S |
| 4.5 | 9,945 | 7.875 | 1,045 S |
| 4.5 | 9,945 | 8.75 | 1,045 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 3, 1997 | May 30, 1997 | — |
| 00 | Dec 6, 1996 | Oct 17, 1996 | Yes |
| 00 | Sep 25, 1996 | Aug 29, 1996 | Yes |
| 00 | Sep 13, 1996 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-293-31135 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-293-31135 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/29331135, documented in the API reference.