WELL · 42-293-31301 · DISTRICT 5

Wilson #11

Y

Limestone County · Box Church (Travis Peak) field · Temp Abandoned  · Vertical

Wilson #11 (API 42-293-31301) is a well in Limestone County operated by Hilltex Operating Company LLC, completed March 3, 2007 and listed as temp abandoned on the RRC schedule.

The RRC has issued one drilling permit, issued June 10, 1999, permitted to 8,350 ft.

It was permitted by ST. Mary Land & Exploration CO. and has since transferred to Hilltex Operating Company LLC on the wellbore schedule.

Completion filings report 6 formation tops, including Austin Chalk, Massive Anhydrite (marker), Rodessa, Pettit.

No lease production has been reported under this well’s leases.

Operator of record

Hilltex Operating Company LLC

Permitted by St. Mary Land & Exploration Co.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jun 10, 2026
Permits on file
125
Phone
(940) 549-5356

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilltex Operating Company LLC
Production reportsAethon Energy Operating LLCthrough Jul 2015
Latest permitSt. Mary Land & Exploration Co.Jun 10, 1999

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,350
total depth, ft
1
permits on file
Jun 10, 1999
last permit issued
Mar 3, 2007
completed
0
cumulative oil, bbl
848K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 1999 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 3, 2007
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Wilson G-5-175477Box Church (Travis Peak)Hilltex Operating Company, LLC10848KNov 1999 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1St. Mary Land & Exploration Co.Nov 1999 → Jun 2010
  2. 2SM Energy CompanyJul 2010 → Jun 2014
  3. 3Aethon Energy Operating LLCJul 2015 → Jul 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
485053-99DrillSt. Mary Land & Exploration Co.Jun 8, 1999Jun 10, 1999Jul 28, 19998,350

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-175477————

Formation tops

As filed on W-2/G-1. Subsea from 375 ft elevation.Download CSV →

FormationMD ftSubsea
Austin ChalkBASE AUSTIN CHALK3,310-2,935
Massive Anhydrite (marker)BASE MASSIVE ANHYDRITE5,976-5,601
Rodessa6,054-5,679
Pettit6,546-6,171
Travis Peak6,721-6,346
Cotton Valley8,602-8,227

Perforations

Perforated and open-hole intervals.

FromToType
7,0687,082Perforated
7,8467,924Perforated
7,9368,011Perforated
8,0888,200Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,59017.51,755 S
9.6256,01012.25940 S
4.58,3477.875855 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 18, 2007Mar 30, 2007—
00Feb 8, 2000Nov 12, 1999Yes
00Jan 31, 2000——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29331301, documented in the API reference.