TEXAS · WELLS · LIMESTONE COUNTY · API 42-293-31320 · DISTRICT 05

Henderson Hazel #3

Plugged

Limestone County · Oletha (Travis Peak) field  · Vertical

Henderson Hazel #3 (API 42-293-31320) is a plugged well in Limestone County, plugged August 25, 2010, last operated by Marathon Oil Company.

The RRC has issued 4 drilling permits between 2000 and 2008, permitted to 11,500 ft.

Completion filings report 6 formation tops, including Base Mass Anhy, Base Mass Anhy., Base Mass Anhydrite, Pettit.

Operator of record

Marathon Oil Company

Based in
Houston, TX
P-5 status
Delinquent (D)
P-5 last filed
Aug 14, 2025
Permits on file
3,707
Phone
(281) 293-1000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsMarathon Oil Companythrough May 2009
Latest permitMarathon Oil CompanySep 24, 2008
11,500
total depth, ft
4
permits on file
Sep 24, 2008
last permit issued
Mar 29, 2008
completed
0
cumulative oil, bbl
734K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2000 THROUGH Aug 2010

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 29, 2008
Shut in
—
Plugged
Aug 25, 2010

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Henderson, Hazel G-5-193357Oletha (Pettit)Marathon Oil Company10295KJan 2003 – Aug 2010
Henderson, Hazel G-5-241567Oletha (Travis Peak)Marathon Oil Company1021.5KMar 2008 – Aug 2010
Henderson, Hazel G-5-178078Oletha (Travis Peak)Marathon Oil Company10417KMay 2000 – Jan 2003

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Marathon Oil CompanyMay 2000 → May 2009

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
670662-99RecompletionMarathon Oil CompanySep 8, 2008Sep 24, 2008—11,000
661657-99RecompletionMarathon Oil CompanyMay 9, 2008May 30, 2008Feb 16, 200811,000
528808-99RecompletionMarathon Oil CompanyFeb 24, 2003Feb 27, 2003Dec 10, 200210,800
492269-99DrillMarathon Oil CompanyFeb 22, 2000Feb 22, 2000Feb 24, 200011,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 29, 2008Henderson Hazel G-5-241567Oletha (Travis Peak)Marathon Oil CompanyPlugged—
Jan 17, 2003Henderson Hazel G-5-193357Oletha (Pettit)Marathon Oil CompanyPlugged—
May 10, 2000Henderson Hazel G-5-178078Oletha (Travis Peak)Marathon Oil CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 12 ft elevation.Download CSV →

FormationMD ftSubsea
Base Mass Anhy6,658-6,646
Base Mass Anhy.6,658-6,646
Base Mass Anhydrite6,658-6,646
Pettit7,278-7,266
Travis Peak7,488-7,476
Cotton Valley9,698-9,686

Perforations

Perforated and open-hole intervals.

FromToType
7,2867,418Perforated
7,4387,451Perforated
7,5187,706Perforated
7,8047,955Perforated
8,1688,264Perforated
8,7038,928Perforated
9,0369,130Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62591812.25350 S
5.510,8008.751,925 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 13, 2008Aug 18, 2008—
00Nov 1, 2008——
00Apr 9, 2003Mar 3, 2003—
00Mar 18, 2003——
00Oct 2, 2000Aug 11, 2000—
00Sep 25, 2000Jun 23, 2000Yes
00Aug 15, 2000——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29331320, documented in the API reference.