TEXAS · WELLS · LIMESTONE COUNTY · API 42-293-31456 · DISTRICT 05

Thompson B.W. Gas Unit No. 1 #7

On schedule

Limestone County · Farrar (Cotton Valley Lime) field · Producing  · Vertical

Fields on the latest permit · any of 2
Farrar (Cotton Valley Lime) · Farrar (Travis Peak)
Not one formation; the well must be completed in one of them, and no target formation is stated.

Thompson B.W. Gas Unit NO. 1 #7 (API 42-293-31456) is a well in Limestone County operated by Hilcorp Energy Company, completed April 17, 2017 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued July 25, 2002, permitted to 13,830 ft.

It was permitted by Xto Energy Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 7 formation tops, including BMA, Pettit, Travis Peak, Cotton Valley.

Its 2 leases have reported 770 barrels of oil and 2.84M mcf of gas since February 2003, last reporting volume in August 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Permitted by XTO Energy Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Mar 27, 2026
Permits on file
3,458
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitXTO Energy Inc.Jul 25, 2002

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,830
total depth, ft
2
permits on file
Jul 25, 2002
last permit issued
Apr 17, 2017
completed
770
cumulative oil, bbl
2.84M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · FEB 2003 THROUGH AUG 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 17, 2017
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Wells nearby

Every well with a location on file around this well, in any state, nearest first.

Loading the map…

Open the full map →

Texas locations come from drilling permits, so most older Texas wells have none and are not listed.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH AUG 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Thompson, B.W. Gas Unit No. 1 G-5-193480Farrar (Cotton Valley Lime)Hilcorp Energy Company17702.84MFeb 2003 – Aug 2026
Thompson, B.W. Gas Unit No. 1 G-5-193479Farrar (Travis Peak)Hilcorp Energy Company100Feb 2003 – —

Gas, mcf lease total

Last 12 months 35,206 · prior 12 30,284(+16%)

02K4K202420252026

Wells named Thompson B.W. Gas Unit No. 1

Hilcorp Energy Company's other wells filed under this lease name in Limestone County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.

Loading the lease's wells

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1XTO Energy Inc.Feb 2003 → Dec 2023
  2. 2Hilcorp Energy CompanyJan 2024 → Aug 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
521997-98DrillXTO Energy Inc.Feb 7, 2003Jul 25, 2002—14,200
521997-99DrillXTO Energy Inc.Jul 19, 2002Jul 25, 2002Nov 29, 200214,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 17, 2017Thompson B.W. Gas Unit No. 1 G-5-193480Farrar (Cotton Valley Lime)Hilcorp Energy CompanyProducing13,830
Feb 21, 2003Thompson B.W. Gas Unit No. 1 G-5-193479Farrar (Travis Peak)Hilcorp Energy CompanySWR-10-Well · shut in Feb 1, 200313,830

Formation tops

As filed on W-2/G-1. Subsea from 455 ft elevation.Download CSV →

FormationMD ftSubsea
BMA7,764-7,309
Pettit8,486-8,031
Travis Peak8,744-8,289
Cotton ValleyCOTTON VALLEY SAND10,663-10,208
CVS10,663-10,208
Bossier12,192-11,737
Cotton ValleyCOTTON VALLEY LIME13,483-13,028
CVL13,483-13,028

Perforations

Perforated and open-hole intervals.

FromToType
9,31310,009Perforated
11,50713,685Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,10012.25418 S
712,1488.751,050 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Sep 21, 2017Jun 7, 2017—
00Apr 17, 2003Mar 10, 2003Yes
00Mar 31, 2003——

Well logs

The RRC's map lists this well among those with logs online. Its monthly inventories loaded here, which start in July 2006, list none for it, so none are itemized.

Open the RRC's log search for this well ↗

Find logs withinmiles of this well:List →Map →

Search the well logs loaded into Petrora →

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

The logs loaded for this well are under Well logs, with the RRC's log search for it.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29331456, documented in the API reference.