TEXAS · WELLS · LIMESTONE COUNTY · API 42-293-31529 · DISTRICT 05
Gibson #6
Limestone County · Farrar SE (Pettit) field · SWR-10-Well · Vertical
Gibson #6 (API 42-293-31529) is a well in Limestone County operated by Hilcorp Energy Company, completed July 10, 2010 and listed as swr-10-well on the RRC schedule.
The RRC has issued 2 drilling permits between 2003 and 2009, permitted to 13,713 ft.
It was permitted by Xto Energy Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.
Completion filings report 6 formation tops, including BMA, Pettit, Travis Peak, Cotton Valle Sand.
Its 3 leases have reported 458 barrels of oil and 2.06M mcf of gas since January 2004, last reporting volume in April 2026. The leases carry 3 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by XTO Energy Inc.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Mar 27, 2026
- Permits on file
- 3,458
- Phone
- (713) 209-2400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hilcorp Energy Company |
| Production reports | Hilcorp Energy Companythrough Apr 2026 |
| Latest permit | XTO Energy Inc.Aug 20, 2009 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 13,713
- total depth, ft
- 2
- permits on file
- Aug 20, 2009
- last permit issued
- Jul 10, 2010
- completed
- 458
- cumulative oil, bbl
- 2.06M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2004 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jul 10, 2010
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Gibson G-5-199720 | Farrar (Cotton Valley Lime) | Hilcorp Energy Company | 1 | 458 | 2.06M | Jan 2004 – Apr 2026 |
| Gibson G-5-257207 | Farrar (Travis Peak) | Hilcorp Energy Company | 1 | 0 | 0 | Jul 2010 – — |
| Gibson G-5-257209 | Farrar, SE (Pettit) | Hilcorp Energy Company | 1 | 0 | 0 | Jul 2010 – — |
Gas, mcf lease total
Last 12 months 50,122 · prior 12 45,318(+11%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1XTO Energy Inc.Jan 2004 → Dec 2023
- 2Hilcorp Energy CompanyJan 2024 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 684114-99 | Recompletion | XTO Energy Inc. | Aug 13, 2009 | Aug 20, 2009 | Nov 20, 2009 | 13,713 |
| 536216-99 | Drill | XTO Energy Inc. | Sep 9, 2003 | Sep 11, 2003 | Nov 7, 2003 | 14,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jul 10, 2010 | Gibson G-5-257209 | Farrar SE (Pettit) | Hilcorp Energy Company | SWR-10-Well · shut in Jul 1, 2010 | 13,713 |
| Jul 10, 2010 | Gibson G-5-257207 | Farrar (Travis Peak) | Hilcorp Energy Company | SWR-10-Well · shut in Jul 1, 2010 | 13,713 |
| Jul 10, 2010 | Gibson G-5-199720 | Farrar (Cotton Valley Lime) | Hilcorp Energy Company | Producing | 13,713 |
Formation tops
As filed on W-2/G-1. Subsea from 442 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| BMA | 7,722 | -7,280 |
| Pettit | 8,439 | -7,997 |
| Travis Peak | 8,695 | -8,253 |
| Cotton Valle Sand | 10,590 | -10,148 |
| Cotton ValleyCOTTON VALLEY SAND | 10,590 | -10,148 |
| Bossier | 12,107 | -11,665 |
| Cotton ValleyCOTTON VALLEY LIME | 13,371 | -12,929 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,468 | 8,626 | Perforated |
| 9,070 | 9,804 | Perforated |
| 11,250 | 13,552 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 1,130 | 17.5 | 840 S |
| 9.625 | 5,142 | 12.25 | 1,700 S |
| 7 | 12,073 | 8.75 | 1,450 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 4, 2010 | Aug 2, 2010 | — |
| 00 | Sep 8, 2010 | — | — |
| 00 | Apr 1, 2004 | Jan 26, 2004 | Yes |
| 00 | Mar 11, 2004 | — | — |
Well logs
The RRC's map lists this well among those with logs online. Its monthly inventories loaded here, which start in July 2006, list none for it, so none are itemized.
Open the RRC's log search for this well ↗The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-293-31529 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-293-31529 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/29331529, documented in the API reference.