TEXAS · WELLS · LIMESTONE COUNTY · API 42-293-31543 · DISTRICT 05

Thompson B. W. Gas Unit No. 1 #10

Y

Limestone County · Farrar (Travis Peak) field · SWR-10-Well  · Vertical

Fields on the latest permit · any of 2
Farrar (Travis Peak) · Farrar, SE (Pettit)
Not one formation; the well must be completed in one of them, and no target formation is stated.

Thompson B. W. Gas Unit NO. 1 #10 (API 42-293-31543) is a well in Limestone County operated by Hilcorp Energy Company, completed December 12, 2007 and listed as swr-10-well on the RRC schedule.

The RRC has issued 2 drilling permits between 2003 and 2007, permitted to 13,100 ft.

It was permitted by Xto Energy Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 5 formation tops, including BMA, Pettit, Travis Peak, Cotton Valley.

Its 3 leases have reported 784 barrels of oil and 2.35M mcf of gas since April 2004, last reporting volume in April 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Permitted by XTO Energy Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,458
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitXTO Energy Inc.Oct 18, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,100
total depth, ft
2
permits on file
Oct 18, 2007
last permit issued
Dec 12, 2007
completed
784
cumulative oil, bbl
2.35M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2004 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 12, 2007
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Thompson, B.W. Gas Unit No. 1 G-5-201727Farrar (Cotton Valley Lime)Hilcorp Energy Company17842.35MApr 2004 – Apr 2026
Thompson, B.W.G.U. No. 1 G-5-233482Farrar, SE (Pettit)Hilcorp Energy Company100Dec 2007 – —
Thompson, B. W. Gas Unit No. 1 G-5-233483Farrar (Travis Peak)Hilcorp Energy Company100Dec 2007 – —

Gas, mcf lease total

Last 12 months 18,668 · prior 12 16,322(+14%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1XTO Energy Inc.Apr 2004 → Dec 2023
  2. 2Hilcorp Energy CompanyJan 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
647775-99RecompletionXTO Energy Inc.Oct 15, 2007Oct 18, 2007Nov 8, 200713,300
538538-99DrillXTO Energy Inc.Nov 12, 2003Nov 18, 2003Feb 7, 200413,300

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 12, 2007Thompson B. W. Gas Unit No. 1 G-5-233483Farrar (Travis Peak)Hilcorp Energy CompanySWR-10-Well · shut in Dec 1, 200713,100
Dec 12, 2007Thompson B.W.G.U. No. 1 G-5-233482Farrar SE (Pettit)Hilcorp Energy CompanySWR-10-Well · shut in Dec 1, 200713,100
Dec 12, 2007Thompson B.W. Gas Unit No. 1 G-5-201727Farrar (Cotton Valley Lime)Hilcorp Energy CompanyProducing13,100

Formation tops

As filed on W-2/G-1. Subsea from 469 ft elevation.Download CSV →

FormationMD ftSubsea
BMA7,830-7,361
Pettit8,566-8,097
Travis Peak8,828-8,359
Cotton ValleyCOTTON VALLEY SAND10,857-10,388
Cotton ValleyCOTTON VALLEY SD10,857-10,388
Bossier12,462-11,993

Perforations

Perforated and open-hole intervals.

FromToType
8,6208,710Perforated
8,93910,128Perforated
11,48412,864Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6255,27512.251,545 S
5.513,1008.751,500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Mar 26, 2008Jan 25, 2008—
00Mar 4, 2008——
00Aug 13, 2004May 10, 2004Yes
00Jun 25, 2004——

Well logs

1 log loaded from the RRC's log index, the latest received Jun 27, 2007. Density, Neutron, Resistivity. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.

Open the RRC's log search for this well ↗
Logas describedFiles Intervalft, as filedDatereceivedSizeMB
Combination: Resistivity/Neutron Density PorosityPLATFORM EXPRESS 150Spans BMA, Pettit, Travis Peak, Cotton Valley, BossierTIFF5,273 to 13,100Jun 27, 2007run Mar 16, 2004—

"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.

Find logs withinmiles of this well:List →Map →

Search the well logs loaded into Petrora →

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

The logs loaded for this well are under Well logs, with the RRC's log search for it.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29331543, documented in the API reference.