TEXAS · WELLS · LIMESTONE COUNTY · API 42-293-31614 · DISTRICT 05

Gross Richard H. et Al #4

On schedule

Limestone County · Freestone (CV-Bossier Cons.) field · Producing  · Vertical

Fields on the latest permit · any of 2
Oaks (Cotton Valley Lime) · Oaks (Cotton Valley-Travis Peak)
Not one formation; the well must be completed in one of them, and no target formation is stated.

Gross Richard H. ET AL #4 (API 42-293-31614) is a well in Limestone County operated by Hilcorp Energy Company, completed March 1, 2006 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued August 31, 2004, permitted to 12,886 ft.

It was permitted by Xto Energy Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 5 formation tops, including BMA, Pettit, Travis Peak, Cotton Valley.

Its 2 leases have reported 20 barrels of oil and 1.19M mcf of gas since December 2004, last reporting volume in August 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Permitted by XTO Energy Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Mar 27, 2026
Permits on file
3,458
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitXTO Energy Inc.Aug 31, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,886
total depth, ft
1
permits on file
Aug 31, 2004
last permit issued
Mar 1, 2006
completed
20
cumulative oil, bbl
1.19M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · DEC 2004 THROUGH AUG 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 1, 2006
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Wells nearby

Every well with a location on file around this well, in any state, nearest first.

Loading the map…

Open the full map →

Texas locations come from drilling permits, so most older Texas wells have none and are not listed.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH AUG 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gross, Richard H. et Al G-5-207423Freestone (CV-Bossier Cons.)Hilcorp Energy Company1201.19MDec 2004 – Aug 2026
Gross, Richard H, et Al G-5-207422Oaks (Cotton Valley-Travis Peak)XTO Energy Inc.100Dec 2004 – —

Gas, mcf lease total

Last 12 months 6,661 · prior 12 6,982(-5%)

05001K1.5K202420252026

Wells named Gross Richard H. et Al

Hilcorp Energy Company's other wells filed under this lease name in Limestone County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.

Loading the lease's wells

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1XTO Energy Inc.Dec 2004 → Dec 2023
  2. 2Hilcorp Energy CompanyJan 2024 → Aug 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
550135-99DrillXTO Energy Inc.Aug 25, 2004Aug 31, 2004Oct 22, 200413,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 1, 2006Gross Richard H. et Al G-5-207423Freestone (CV-Bossier Cons.)Hilcorp Energy CompanyProducing12,886
Dec 31, 2004Gross Richard H et Al G-5-207422Oaks (Cotton Valley-Travis Peak)XTO Energy Inc.Not on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 383 ft elevation.Download CSV →

FormationMD ftSubsea
BMA7,263-6,880
Pettit7,934-7,551
Travis Peak8,176-7,793
Cotton ValleyCOTTON VALLEY SAND9,990-9,607
Bossier11,403-11,020
Cotton ValleyCOTTON VALLEY LIME12,587-12,204

Perforations

Perforated and open-hole intervals.

FromToType
10,54311,816Perforated
10,54312,751Perforated
12,71412,751Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,55012.25870 S
5.512,8868.751,800 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Sep 7, 2006Apr 28, 2006—
00Jun 21, 2005Feb 14, 2005Yes
00Apr 11, 2005——

Well logs

1 log loaded from the RRC's log index, the latest received Jul 29, 2008. Density, Neutron, Resistivity. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.

Open the RRC's log search for this well ↗
Logas describedFiles Intervalft, as filedDatereceivedSizeMB
COMBINATION: RESISTIVITY/NEUTRON/DENSITY POROSITYSpans BMA, Pettit, Travis Peak, Cotton Valley, BossierTIFF2,550 to 12,886Jul 29, 2008run Nov 15, 20048.14

"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.

Find logs withinmiles of this well:List →Map →

Search the well logs loaded into Petrora →

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

The logs loaded for this well are under Well logs, with the RRC's log search for it.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29331614, documented in the API reference.