TEXAS · WELLS · LIMESTONE COUNTY · API 42-293-31616 · DISTRICT 05

Reed R No. 1 Unit #6

Y

Limestone County · Freestone (CV-Bossier Cons.) field · Producing  · Vertical

Reed R NO. 1 Unit #6 (API 42-293-31616) is a well in Limestone County operated by Hilcorp Energy Company, completed January 17, 2010 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 2004 and 2006, permitted to 12,835 ft.

It was permitted by Xto Energy Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 5 formation tops, including BMA, Pettit, Travis Peak, Cotton Valley.

Its 4 leases have reported 351 barrels of oil and 1.14M mcf of gas since July 2005, last reporting volume in April 2026. The leases carry 4 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Permitted by XTO Energy Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,458
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitXTO Energy Inc.Oct 23, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,835
total depth, ft
2
permits on file
Oct 23, 2006
last permit issued
Jan 17, 2010
completed
351
cumulative oil, bbl
1.14M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2005 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 17, 2010
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Reed "R" No. 1 Unit G-5-215543Freestone (CV-Bossier Cons.)Hilcorp Energy Company13511.14MJul 2005 – Apr 2026
Reed "R" No. 1 Unit G-5-215544Oaks (Cotton Valley-Travis Peak)XTO Energy Inc.100Jul 2005 – —
Reed "R" No. 1 Unit G-5-223256Freestone (Travis Peak)Hilcorp Energy Company100Nov 2006 – —
Reed "R" No. 1 Unit G-5-223257Donie (Pettit)Hilcorp Energy Company100Nov 2006 – —

Gas, mcf lease total

Last 12 months 3,024 · prior 12 2,748(+10%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1XTO Energy Inc.Jul 2005 → Dec 2023
  2. 2Hilcorp Energy CompanyJan 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
627550-99RecompletionXTO Energy Inc.Oct 13, 2006Oct 23, 2006Oct 4, 200613,300
550177-99DrillXTO Energy Inc.Aug 26, 2004Aug 27, 2004May 19, 200513,300

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 17, 2010Reed R No. 1 Unit G-5-215543Freestone (CV-Bossier Cons.)Hilcorp Energy CompanyProducing12,835
Nov 8, 2006Reed R No. 1 Unit G-5-223257Donie (Pettit)Hilcorp Energy CompanySWR-10-Well · shut in Nov 1, 200612,835
Nov 8, 2006Reed R No. 1 Unit G-5-223256Freestone (Travis Peak)Hilcorp Energy CompanySWR-10-Well · shut in Nov 1, 200612,835
Jul 12, 2005Reed R No. 1 Unit G-5-215544Oaks (Cotton Valley-Travis Peak)XTO Energy Inc.Not on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 417 ft elevation.Download CSV →

FormationMD ftSubsea
BMA7,299-6,882
Pettit7,968-7,551
Travis Peak8,206-7,789
Cotton ValleyCOTTON VALLEY LIME9,983-9,566
Bossier11,390-10,973
Cotton ValleyCOTTON VALLEY LIME12,481-12,064

Perforations

Perforated and open-hole intervals.

FromToType
7,9918,110Perforated
8,3079,097Perforated
8,7689,097Perforated
10,55212,602Perforated
11,15612,556Perforated
11,15612,602Perforated
12,58812,602Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,11012.25350 S
5.512,8357.8752,121 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jul 21, 2010Mar 2, 2010—
00Apr 23, 2007Dec 5, 2006—
00Apr 19, 2007Dec 5, 2006—
00Mar 1, 2007Oct 6, 2006—
00Dec 18, 2006——
00Aug 29, 2006Aug 29, 2005Yes
00Apr 28, 2006——

Well logs

1 log loaded from the RRC's log index, the latest received Sep 19, 2008. Density, Neutron, Resistivity. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.

Open the RRC's log search for this well ↗
Logas describedFiles Intervalft, as filedDatereceivedSizeMB
COMBINATION: RESISTIVITY/NEUTRON/DENSITY POROSITYSpans BMA, Pettit, Travis Peak, Cotton Valley, BossierTIFF7,100 to 12,826Sep 19, 2008run Jun 13, 200519.8

"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.

Find logs withinmiles of this well:List →Map →

Search the well logs loaded into Petrora →

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

The logs loaded for this well are under Well logs, with the RRC's log search for it.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29331616, documented in the API reference.