WELL · 42-293-31878 · DISTRICT 5

White #15

Y

Limestone County · Box Church (Travis Peak) field · Producing  · Vertical

White #15 (API 42-293-31878) is a well in Limestone County operated by Hilltex Operating Company LLC, completed August 23, 2013 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued October 16, 2006, permitted to 8,500 ft.

It was permitted by ST. Mary Land & Exploration CO. and has since transferred to Hilltex Operating Company LLC on the wellbore schedule.

Completion filings report 6 formation tops, including Austin Chalk, Glen Rose, Anhydrite, Rodessa.

No lease production has been reported under this well’s leases.

Operator of record

Hilltex Operating Company LLC

Permitted by St. Mary Land & Exploration Co.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jun 10, 2026
Permits on file
125
Phone
(940) 549-5356

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilltex Operating Company LLC
Production reportsHilltex Operating Company, LLCthrough Mar 2026
Latest permitSt. Mary Land & Exploration Co.Oct 16, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,500
total depth, ft
1
permits on file
Oct 16, 2006
last permit issued
Aug 23, 2013
completed
0
cumulative oil, bbl
248K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2006 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 23, 2013
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
White G-5-246762Box Church (Travis Peak)Hilltex Operating Company, LLC10248KDec 2006 – Jul 2026

Gas, mcf lease total

Last 12 months 321 · prior 12 0

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1St. Mary Land & Exploration Co.Dec 2006 → Aug 2009
  2. 2SM Energy CompanyApr 2012 → Sep 2013
  3. 3Downs Operating Company, LLCNov 2019 → Jan 2020
  4. 4Zenith Oil & Gas, LLCJul 2020 → Mar 2022
  5. 5Hilltex Operating Company, LLCFeb 2026 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
627570-99DrillSt. Mary Land & Exploration Co.Oct 13, 2006Oct 16, 2006Nov 21, 20068,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-246762————

Formation tops

As filed on W-2/G-1. Subsea from 405 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk2,860-2,455
Glen Rose5,072-4,667
Anhydrite5,980-5,575
Rodessa6,040-5,635
Pettit6,561-6,156
Travis Peak6,730-6,325

Perforations

Perforated and open-hole intervals.

FromToType
6,7426,812Perforated
6,8656,879Perforated
6,9246,930Perforated
7,0327,038Perforated
7,3907,400Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,51011455 S
4.57,6427.875600 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 26, 2014Sep 12, 2013—
00May 27, 2009May 14, 2007Yes
00May 4, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29331878, documented in the API reference.