WELL · 42-293-31965 · DISTRICT 5

Wilson #16

Y

Limestone County · Box Church (Travis Peak) field · Producing  · Vertical

Wilson #16 (API 42-293-31965) is a well in Limestone County operated by Hilltex Operating Company LLC, completed November 25, 2007 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued June 4, 2007, permitted to 8,000 ft.

It was permitted by ST. Mary Land & Exploration CO. and has since transferred to Hilltex Operating Company LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Anhydrite, Rodessa, Pettit, Travis Peak.

No lease production has been reported under this well’s leases.

Operator of record

Hilltex Operating Company LLC

Permitted by St. Mary Land & Exploration Co.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jun 10, 2026
Permits on file
125
Phone
(940) 549-5356

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilltex Operating Company LLC
Production reportsHilltex Operating Company, LLCthrough Mar 2026
Latest permitSt. Mary Land & Exploration Co.Jun 4, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,000
total depth, ft
1
permits on file
Jun 4, 2007
last permit issued
Nov 25, 2007
completed
0
cumulative oil, bbl
548K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2007 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 25, 2007
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Wilson G-5-233701Box Church (Travis Peak)Hilltex Operating Company, LLC10548KNov 2007 – Jul 2026

Gas, mcf lease total

Last 12 months 2,092 · prior 12 2,388(-12%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1St. Mary Land & Exploration Co.Nov 2007 → Jun 2010
  2. 2SM Energy CompanyJul 2010 → Jun 2015
  3. 3Aethon Energy Operating LLCJul 2015 → Dec 2017
  4. 4Downs Operating Company, LLCFeb 2018 → May 2020
  5. 5Zenith Oil & Gas, LLCJun 2020 → Feb 2023
  6. 6Beehive Operating, LLCMar 2023 → Sep 2025
  7. 7Hilltex Operating Company, LLCDec 2025 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
639751-99DrillSt. Mary Land & Exploration Co.May 29, 2007Jun 4, 2007Aug 23, 20078,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-233701————

Formation tops

As filed on W-2/G-1. Subsea from 400 ft elevation.Download CSV →

FormationMD ftSubsea
Anhydrite6,026-5,626
Rodessa6,082-5,682
Pettit6,614-6,214
Travis Peak6,792-6,392

Perforations

Perforated and open-hole intervals.

FromToType
6,9696,975Perforated
7,0277,034Perforated
7,0787,084Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,52811442 S
4.57,5307.875475 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 31, 2008Feb 28, 2008Yes
00Mar 11, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29331965, documented in the API reference.