WELL · 42-293-31967 · DISTRICT 5

Txu Mining Co. #2

Shut in

Limestone County · Bald Prairie (CV Consolidated) field · Temp Abandoned  · Vertical

Txu Mining CO. #2 (API 42-293-31967) is a well in Limestone County operated by Zarvona Energy LLC, completed November 15, 2007 and listed as temp abandoned on the RRC schedule, shut in August 1, 2024.

The RRC has issued one drilling permit, issued July 2, 2007, permitted to 12,117 ft.

It was permitted by Encana Oil & Gas(USA) Inc. and has since transferred to Zarvona Energy LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Buda, Pettit, Travis Peak, Cotton Valley.

No lease production has been reported under this well’s leases.

Operator of record

Zarvona Energy LLC

Permitted by Encana Oil & Gas(usa) Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Jun 2, 2026
Permits on file
98
Phone
(713) 600-0600

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleZarvona Energy LLC
Production reportsZarvona Energy LLCthrough Jul 2024
Latest permitEncana Oil & Gas(usa) Inc.Jul 2, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,117
total depth, ft
1
permits on file
Jul 2, 2007
last permit issued
Nov 15, 2007
completed
0
cumulative oil, bbl
190K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2007 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 15, 2007
Shut in
Aug 1, 2024
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Txu Mining Co. G-5-233724Bald Prairie (CV Consolidated)Zarvona Energy LLC10190KNov 2007 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 210(-100%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Approach Operating LLCDec 2007 → Sep 2020
  2. 2Zarvona Energy LLCOct 2020 → Jul 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
641067-99DrillEncana Oil & Gas(usa) Inc.Jun 20, 2007Jul 2, 2007Aug 12, 200712,600

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 15, 2007Txu Mining Co. G-5-233724Bald Prairie (CV Consolidated)Zarvona Energy LLCTemp Abandoned · shut in Aug 1, 202412,117

Formation tops

As filed on W-2/G-1. Subsea from 425 ft elevation.Download CSV →

FormationMD ftSubsea
Buda4,455-4,030
PettitPETTET7,207-6,782
Travis Peak7,442-7,017
Cotton ValleyCOTTON VALLEY SAND9,274-8,849
Bossier10,044-9,619
Cotton ValleyCOTTON VALLEY LIME11,533-11,108

Perforations

Perforated and open-hole intervals.

FromToType
9,7369,852Perforated
9,96610,208Perforated
10,30410,478Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,53912.25530 S
4.512,1118.751,085 S
4.5—8.75530 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 31, 2008Feb 25, 2008Yes
00Mar 11, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29331967, documented in the API reference.