TEXAS · WELLS · LIMESTONE COUNTY · PERLITZ GAS UNIT NO. 1 LEASE · API 42-293-32071 · DISTRICT 05

Perlitz Gas Unit No. 1 #18

Y

Limestone County · Farrar (Cotton Valley Lime) field · Producing  · Vertical

Fields on the latest permit · any of 3
Farrar (Cotton Valley Lime) · Farrar (Travis Peak) · Farrar, SE (Pettit)
Not one formation; the well must be completed in one of them, and no target formation is stated.

Perlitz Gas Unit NO. 1 #18 (API 42-293-32071) is a well in Limestone County operated by Hilcorp Energy Company, completed March 26, 2009 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued December 17, 2007, permitted to 13,950 ft.

It was permitted by Xto Energy Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 4 formation tops, including BMA, Pettit, Travis Peak, Cv Cons..

Its lease has reported 139 barrels of oil and 1.47M mcf of gas since March 2009, last reporting volume in April 2026.

Operator of record

Hilcorp Energy Company

Permitted by XTO Energy Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,458
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitXTO Energy Inc.Dec 17, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,950
total depth, ft
2
permits on file
Dec 17, 2007
last permit issued
Mar 26, 2009
completed
139
cumulative oil, bbl
1.47M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2009 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 26, 2009
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Perlitz Gas Unit No. 1 G-5-251012Farrar (Cotton Valley Lime)Hilcorp Energy Company11391.47MMar 2009 – Apr 2026

Gas, mcf lease total

Last 12 months 34,718 · prior 12 32,674(+6%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1XTO Energy Inc.Mar 2009 → Dec 2023
  2. 2Hilcorp Energy CompanyJan 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
651196-98DrillXTO Energy Inc.Dec 21, 2007Dec 17, 2007Jan 24, 200914,500
651196-99DrillXTO Energy Inc.Dec 11, 2007Dec 17, 2007—14,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 26, 2009Perlitz Gas Unit No. 1 G-5-251012Farrar (Cotton Valley Lime)Hilcorp Energy CompanyProducing13,950

Formation tops

As filed on W-2/G-1. Subsea from 416 ft elevation.Download CSV →

FormationMD ftSubsea
BMA7,759-7,343
Pettit8,485-8,069
Travis Peak8,742-8,326
CV Cons.11,302-10,886

Perforations

Perforated and open-hole intervals.

FromToType
11,33013,756Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,23712.25403 S
5.513,9508.751,293 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Nov 5, 2009May 4, 2009Yes
00Sep 22, 2009——

Well logs

1 log loaded from the RRC's log index, the latest received Feb 16, 2012. Resistivity. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.

Open the RRC's log search for this well ↗
Logas describedFiles Intervalft, as filedDatereceivedSizeMB
RESISTIVITYSpans BMA, Pettit, Travis Peak, Cv Cons.TIFF1,237 to 13,962Feb 16, 2012run Feb 13, 20096.70

"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.

Find logs withinmiles of this well:List →Map →

Search the well logs loaded into Petrora →

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

The logs loaded for this well are under Well logs, with the RRC's log search for it.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29332071, documented in the API reference.