TEXAS · WELLS · LIMESTONE COUNTY · C & W GAS UNIT NO. 1 LEASE · API 42-293-32180 · DISTRICT 05

C & W Gas Unit No. 1 #11H

Y

Limestone County · Farrar (Cotton Valley Lime) field · Producing  · Horizontal

C & W Gas Unit NO. 1 #11H (API 42-293-32180) is a horizontal well in Limestone County operated by Hilcorp Energy Company, completed March 2, 2010 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued August 22, 2008, permitted to 17,000 ft.

It was permitted by Xto Energy Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 6 formation tops, including BMA, Pettit, Travis Peak, Cv Cons..

Its lease has reported 77 barrels of oil and 1.26M mcf of gas since March 2010, last reporting volume in April 2026.

Operator of record

Hilcorp Energy Company

Permitted by XTO Energy Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,458
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitXTO Energy Inc.Mar 11, 2009

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

17,000
total depth, ft
2
permits on file
Mar 11, 2009
last permit issued
Mar 2, 2010
completed
77
cumulative oil, bbl
1.26M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2010 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 2, 2010
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
C & W Gas Unit No. 1 G-5-257926Farrar (Cotton Valley Lime)Hilcorp Energy Company1771.26MMar 2010 – Apr 2026

Gas, mcf lease total

Last 12 months 28,211 · prior 12 31,625(-11%)

02K4K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1XTO Energy Inc.Mar 2010 → Dec 2023
  2. 2Hilcorp Energy CompanyJan 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
668356-98DrillXTO Energy Inc.Feb 27, 2009Mar 11, 2009Dec 5, 200917,500
668356-99DrillXTO Energy Inc.Aug 5, 2008Aug 22, 2008—17,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 2, 2010C & W Gas Unit No. 1 G-5-257926Farrar (Cotton Valley Lime)Hilcorp Energy CompanyProducing17,000

Formation tops

As filed on W-2/G-1. Subsea from 386 ft elevation.Download CSV →

FormationMD ftSubsea
BMA7,533-7,147
Pettit8,223-7,837
Travis Peak8,474-8,088
CV Cons.10,964-10,578
Bossier11,920-11,534
CVL13,129-12,743

Perforations

Perforated and open-hole intervals.

FromToType
13,48016,544Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6255,14712.251,190 S
5.517,0008.752,795 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Nov 24, 2010Jun 1, 2010Yes
00Nov 10, 2010——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29332180, documented in the API reference.