TEXAS · WELLS · LIMESTONE COUNTY · API 42-293-32302 · DISTRICT 05
B. W. Thompson Gas Unit No. 1 #24
Limestone County · Farrar (Travis Peak) field · SWR-10-Well · Vertical
B. W. Thompson Gas Unit NO. 1 #24 (API 42-293-32302) is a well in Limestone County operated by Hilcorp Energy Company, completed February 28, 2011 and listed as swr-10-well on the RRC schedule.
The RRC has issued one drilling permit, issued June 1, 2010, permitted to 13,118 ft.
It was permitted by Xto Energy Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.
Completion filings report 4 formation tops, including Pettit, Travis Peak, Cvs, Bossier.
Its 3 leases have reported 192 barrels of oil and 1.51M mcf of gas since February 2011, last reporting volume in April 2026. The leases carry 3 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by XTO Energy Inc.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Mar 27, 2026
- Permits on file
- 3,458
- Phone
- (713) 209-2400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hilcorp Energy Company |
| Production reports | Hilcorp Energy Companythrough Apr 2026 |
| Latest permit | XTO Energy Inc.Jun 1, 2010 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 13,118
- total depth, ft
- 1
- permits on file
- Jun 1, 2010
- last permit issued
- Feb 28, 2011
- completed
- 192
- cumulative oil, bbl
- 1.51M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2011 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Feb 28, 2011
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| B. W. Thompson Gas Unit No. 1 G-5-260709 | Farrar (Cotton Valley Lime) | Hilcorp Energy Company | 1 | 192 | 1.51M | Feb 2011 – Apr 2026 |
| B. W. Thompson Gas Unit No. 1 G-5-260714 | Farrar, SE (Pettit) | Hilcorp Energy Company | 1 | 0 | 0 | Feb 2011 – — |
| B. W. Thompson Gas Unit No. 1 G-5-260718 | Farrar (Travis Peak) | Hilcorp Energy Company | 1 | 0 | 0 | Feb 2011 – — |
Gas, mcf lease total
Last 12 months 36,186 · prior 12 44,128(-18%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1XTO Energy Inc.Feb 2011 → Dec 2023
- 2Hilcorp Energy CompanyJan 2024 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 696650-99 | Drill | XTO Energy Inc. | May 27, 2010 | Jun 1, 2010 | Dec 9, 2010 | 13,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Feb 28, 2011 | B. W. Thompson Gas Unit No. 1 G-5-260718 | Farrar (Travis Peak) | Hilcorp Energy Company | SWR-10-Well · shut in Feb 1, 2011 | 13,118 |
| Feb 28, 2011 | B. W. Thompson Gas Unit No. 1 G-5-260714 | Farrar SE (Pettit) | Hilcorp Energy Company | SWR-10-Well · shut in Feb 1, 2011 | 13,118 |
| Feb 28, 2011 | B. W. Thompson Gas Unit No. 1 G-5-260709 | Farrar (Cotton Valley Lime) | Hilcorp Energy Company | Producing | 13,118 |
Formation tops
As filed on W-2/G-1. Subsea from 476 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Pettit | 8,571 | -8,095 |
| Travis Peak | 8,830 | -8,354 |
| CVS | 10,840 | -10,364 |
| Bossier | 12,414 | -11,938 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,651 | 8,771 | Perforated |
| 8,946 | 9,416 | Perforated |
| 11,462 | 12,829 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,250 | 12.25 | 425 S |
| 5.5 | 13,118 | 8.75 | 2,576 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 8, 2011 | Apr 6, 2011 | — |
| 00 | Sep 7, 2011 | Apr 6, 2011 | — |
| 00 | Sep 6, 2011 | Apr 6, 2011 | Yes |
Well logs
1 log loaded from the RRC's log index, the latest received Dec 23, 2013. Resistivity. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.
Open the RRC's log search for this well ↗| Logas described | Files | Intervalft, as filed | Datereceived | SizeMB |
|---|---|---|---|---|
| RESISTIVITYSpans Pettit, Travis Peak, Cvs, Bossier | TIFF | 1,248 to 13,140 | Dec 23, 2013run Dec 24, 2010 | 5.51 |
"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-293-32302 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-293-32302 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/29332302, documented in the API reference.