TEXAS · WELLS · LIMESTONE COUNTY · ROBERT SHAW GAS UNIT NO. 1 LEASE · API 42-293-32307 · DISTRICT 05

Robert Shaw Gas Unit No. 1 #2H

Y

Limestone County · Farrar (Cotton Valley Lime) field · Producing  · Horizontal

Robert Shaw Gas Unit NO. 1 #2H (API 42-293-32307) is a horizontal well in Limestone County operated by Hilcorp Energy Company, completed July 7, 2011 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued August 31, 2010, permitted to 13,421 ft.

It was permitted by Xto Energy Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 4 formation tops, including Pettit, Travis Peak, Knowles, Bossier.

Its lease has reported 114 barrels of oil and 5.08M mcf of gas since June 2011, last reporting volume in April 2026.

Operator of record

Hilcorp Energy Company

Permitted by XTO Energy Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,458
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitXTO Energy Inc.Aug 31, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,421
total depth, ft
1
permits on file
Aug 31, 2010
last permit issued
Jul 7, 2011
completed
114
cumulative oil, bbl
5.08M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2011 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 7, 2011
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Robert Shaw Gas Unit No. 1 G-5-261556Farrar (Cotton Valley Lime)Hilcorp Energy Company11145.08MJun 2011 – Apr 2026

Gas, mcf lease total

Last 12 months 85,970 · prior 12 103,435(-17%)

05K10K15K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1XTO Energy Inc.Jul 2011 → Dec 2023
  2. 2Hilcorp Energy CompanyJan 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
700201-99DrillXTO Energy Inc.Aug 4, 2010Aug 31, 2010Oct 22, 201018,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 7, 2011Robert Shaw Gas Unit No. 1 G-5-261556Farrar (Cotton Valley Lime)Hilcorp Energy CompanyProducing13,421

Formation tops

As filed on W-2/G-1. Subsea from 412 ft elevation.Download CSV →

FormationMD ftSubsea
Pettit8,280-7,868
Travis Peak8,532-8,120
Knowles11,040-10,628
Bossier11,978-11,566

Perforations

Perforated and open-hole intervals.

FromToType
13,41020,927Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6255,20012.251,540 S
713,6428.751,230 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Mar 1, 2012Aug 31, 2011—
00Dec 14, 2011Jul 7, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29332307, documented in the API reference.