WELL · 42-295-30184 · DISTRICT 10

Laubhan #1

Plugged

Lipscomb County · Lipscomb (Morrow-Oil) field  · Vertical

Laubhan #1 (API 42-295-30184) is a plugged well in Lipscomb County, plugged March 10, 1981, last operated by Grace Petroleum Corp..

The RRC has issued one drilling permit, issued August 13, 1980, permitted to 10,006 ft.

Operator of record

Grace Petroleum Corp.

Based in
Tulsa, OK
P-5 status
Inactive (I)
P-5 last filed
May 19, 1992
Permits on file
280
Phone
(405) 840-6750

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitGrace Petroleum Corp.Aug 13, 1980
10,006
total depth, ft
1
permits on file
Aug 13, 1980
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Mar 10, 1981

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
89636-99RecompletionGrace Petroleum Corp.Aug 13, 1980Aug 13, 1980—10,006

Completions

CompletedLeaseFieldOperatorStatusDepth
—Laubhan O-14-4018Lipscomb (Morrow-Oil)Grace Petroleum Corp.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
8,7569,864Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,51412.25—
2.87510,0007.875—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29530184, documented in the API reference.