TEXAS · WELLS · LIPSCOMB COUNTY · KRAFT, GEORGE LEASE · API 42-295-31709 · DISTRICT 08

Kraft George #2093

Shut in

Lipscomb County · Follett (Morrow) field · Temp Abandoned  · Vertical

Kraft George #2093 (API 42-295-31709) is a well in Lipscomb County operated by Remora Operating LLC, completed June 15, 1986 and listed as temp abandoned on the RRC schedule, shut in June 1, 2015.

The RRC has issued one drilling permit, issued February 3, 1986, permitted to 9,100 ft.

It was permitted by Samson Resources Company and has since transferred to Remora Operating LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Morrow, Chester.

Its lease has reported 94 barrels of oil and 228K mcf of gas since January 1993, with no volume in the three years through April 2026.

Operator of record

Remora Operating LLC

Permitted by Samson Resources Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jun 1, 2026
Permits on file
2
Phone
(281) 893-9400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRemora Operating LLC
Production reportsRemora Operating, LLCthrough May 2015
Latest permitSamson Resources CompanyFeb 3, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,100
total depth, ft
1
permits on file
Feb 3, 1986
last permit issued
Jun 15, 1986
completed
94
cumulative oil, bbl
228K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2015

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 15, 1986
Shut in
Jun 1, 2015
Plugged
—

Operator's P-5 on the schedule: Active – Hearing (H)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Kraft, George G-14-122780Follett (Morrow)Remora Operating, LLC194228KJan 1993 – May 2015

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Samson Resources CompanyJan 1993 → Mar 1995
  2. 2Samson Hydrocarbons CompanyMay 1995 → Jul 1996
  3. 3Samson Lone Star LPAug 1996 → Jun 2007
  4. 4Samson Lone Star, LLCJul 2007 → May 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
301431-99DrillSamson Resources CompanyNov 13, 1985Feb 3, 1986Apr 25, 19869,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 15, 1986Kraft George G-14-122780Follett (Morrow)Remora Operating LLCTemp Abandoned · shut in Jun 1, 20159,100

Formation tops

As filed on W-2/G-1. Subsea from 2,475 ft elevation.Download CSV →

FormationMD ftSubsea
Morrow8,278-5,803
Chester9,014-6,539

Perforations

Perforated and open-hole intervals.

FromToType
8,4398,443Perforated
8,7198,729Perforated
8,7448,765Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,60512.25700 S
4.59,0867.875360 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 2, 1987Jul 16, 1986Yes
00Dec 30, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29531709, documented in the API reference.