TEXAS · WELLS · LIPSCOMB COUNTY · MILLER -B- LEASE · API 42-295-32699 · DISTRICT 08

Miller -B- #6778

Y

Lipscomb County · Lipscomb (Cleveland) field · Producing  · Horizontal

Miller -B- #6778 (API 42-295-32699) is a horizontal well in Lipscomb County operated by Latigo Petroleum LLC, completed December 31, 2003 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued September 18, 2003, permitted to 7,966 ft.

It was permitted by BP America Production Company and has since transferred to Latigo Petroleum LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Douglas, Tonkawa, Kc Lime, Cleveland.

Its lease has reported 14.6K barrels of oil and 1.36M mcf of gas since December 2003, last reporting volume in March 2026.

Operator of record

Latigo Petroleum LLC

Permitted by BP America Production Company; the EWA schedule now lists a different operator.

Based in
Pampa, TX
P-5 status
Active (A)
P-5 last filed
Jul 17, 2025
Permits on file
76
Phone
(806) 665-8441

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLatigo Petroleum LLC
Production reportsLatigo Petroleum, LLCthrough Mar 2026
Latest permitBP America Production CompanySep 18, 2003

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,966
total depth, ft
1
permits on file
Sep 18, 2003
last permit issued
Dec 31, 2003
completed
14.6K
cumulative oil, bbl
1.36M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2003 THROUGH Mar 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 31, 2003
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Miller -B- G-14-199579Lipscomb (Cleveland)Latigo Petroleum, LLC114.6K1.36MDec 2003 – Mar 2026

Gas, mcf lease total

Last 12 months 9,270 · prior 12 9,699(-4%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1BP America Production CompanyDec 2003 → Feb 2020
  2. 2Latigo Petroleum, LLCMar 2020 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
535640-99DrillBP America Production CompanyAug 21, 2003Sep 18, 2003Nov 8, 20038,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 31, 2003Miller -B- G-14-199579Lipscomb (Cleveland)Latigo Petroleum LLCProducing7,966

Formation tops

As filed on W-2/G-1. Subsea from 2,539 ft elevation.Download CSV →

FormationMD ftSubsea
DouglasDOUGLAS SAND6,113-3,574
Tonkawa6,608-4,069
KC Lime7,466-4,927
Cleveland7,521-4,982
ClevelandCLEVELAND SAND7,642-5,103

Perforations

Perforated and open-hole intervals.

FromToType
8,0099,700Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,21112.25428 S
5.59,6908.75819 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Mar 30, 2004Feb 19, 2004Yes
00Mar 8, 2004——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29532699, documented in the API reference.