TEXAS · WELLS · LIPSCOMB COUNTY · CLEVELAND 107 LEASE · API 42-295-33767 · DISTRICT 08
Cleveland 107 #2H
Lipscomb County · Glazier NW. (Tonkawa) field · NO Production · Horizontal
Cleveland 107 #2H (API 42-295-33767) is a horizontal well in Lipscomb County operated by BE Anadarko II LLC, completed December 10, 2012 and listed as no production on the RRC schedule, shut in July 1, 2025.
The RRC has issued one drilling permit (amended once), issued September 21, 2011, permitted to 7,472 ft.
It was permitted by Hadaway Consult And Engineer,LLC and has since transferred to BE Anadarko II LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Pennsylvanian, Douglas, Tonkawa.
Its lease has reported 21.7K barrels of oil and 166K mcf of gas since January 2012, last reporting in July 2026.
Operator of record
Permitted by Hadaway Consult and Engineer,llc; the EWA schedule now lists a different operator.
- Based in
- Austin, TX
- P-5 status
- Active (A)
- P-5 last filed
- Nov 19, 2025
- Permits on file
- 2
- Phone
- (917) 204-3126
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | BE Anadarko II LLC |
| Production reports | BE Anadarko II, LLCthrough Apr 2026 |
| Latest permit | Hadaway Consult and Engineer,llcSep 21, 2011 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,472
- total depth, ft
- 2
- permits on file
- Sep 21, 2011
- last permit issued
- Dec 10, 2012
- completed
- 21.7K
- cumulative oil, bbl
- 166K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2012 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Dec 10, 2012
- Shut in
- Jul 1, 2025
- Plugged
- —
Operator's P-5 on the schedule: Delinquent (D)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Cleveland 107 O-14-8894 | Glazier, NW. (Tonkawa) | BE Anadarko II, LLC | 1 | 21.7K | 166K | Jan 2012 – Jul 2026 |
Gas, mcf lease total
Last 12 months 2,516 · prior 12 3,644(-31%)
Oil, barrels lease total
Last 12 months 20 · prior 12 195(-90%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Chalker Operating Inc.Jan 2012 → Apr 2012
- 2Jones Energy, LLCMay 2012 → Aug 2019
- 3Revolution Operating Company,llcNov 2020 → Mar 2024
- 4BE Anadarko II, LLCMay 2024 → May 2025
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 724434-98 | Drill | Hadaway Consult and Engineer,llc | Oct 25, 2011 | Sep 21, 2011 | Oct 1, 2011 | 7,500 |
| 724434-99 | Drill | Hadaway Consult and Engineer,llc | Sep 16, 2011 | Sep 21, 2011 | Oct 1, 2011 | 7,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Dec 10, 2012 | Cleveland 107 O-14-8894 | Glazier NW. (Tonkawa) | BE Anadarko II LLC | NO Production · shut in Jul 1, 2025 | 7,472 |
Formation tops
As filed on W-2/G-1. Subsea from 2,758 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| PennsylvanianPENN SHALE | 5,511 | -2,753 |
| Douglas | 6,896 | -4,138 |
| Tonkawa | 7,452 | -4,694 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,730 | 11,733 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,780 | 12.25 | 890 S |
| 7 | 7,730 | 8.75 | 290 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 29, 2014 | Jun 17, 2013 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-295-33767 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-295-33767 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/29533767, documented in the API reference.