TEXAS · WELLS · LIPSCOMB COUNTY · CLEVELAND 107 LEASE · API 42-295-33767 · DISTRICT 08

Cleveland 107 #2H

Shut in

Lipscomb County · Glazier NW. (Tonkawa) field · NO Production  · Horizontal

Cleveland 107 #2H (API 42-295-33767) is a horizontal well in Lipscomb County operated by BE Anadarko II LLC, completed December 10, 2012 and listed as no production on the RRC schedule, shut in July 1, 2025.

The RRC has issued one drilling permit (amended once), issued September 21, 2011, permitted to 7,472 ft.

It was permitted by Hadaway Consult And Engineer,LLC and has since transferred to BE Anadarko II LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Pennsylvanian, Douglas, Tonkawa.

Its lease has reported 21.7K barrels of oil and 166K mcf of gas since January 2012, last reporting in July 2026.

Operator of record

BE Anadarko II LLC

Permitted by Hadaway Consult and Engineer,llc; the EWA schedule now lists a different operator.

Based in
Austin, TX
P-5 status
Active (A)
P-5 last filed
Nov 19, 2025
Permits on file
2
Phone
(917) 204-3126

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBE Anadarko II LLC
Production reportsBE Anadarko II, LLCthrough Apr 2026
Latest permitHadaway Consult and Engineer,llcSep 21, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,472
total depth, ft
2
permits on file
Sep 21, 2011
last permit issued
Dec 10, 2012
completed
21.7K
cumulative oil, bbl
166K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2012 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 10, 2012
Shut in
Jul 1, 2025
Plugged
—

Operator's P-5 on the schedule: Delinquent (D)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cleveland 107 O-14-8894Glazier, NW. (Tonkawa)BE Anadarko II, LLC121.7K166KJan 2012 – Jul 2026

Gas, mcf lease total

Last 12 months 2,516 · prior 12 3,644(-31%)

05001K202420252026

Oil, barrels lease total

Last 12 months 20 · prior 12 195(-90%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chalker Operating Inc.Jan 2012 → Apr 2012
  2. 2Jones Energy, LLCMay 2012 → Aug 2019
  3. 3Revolution Operating Company,llcNov 2020 → Mar 2024
  4. 4BE Anadarko II, LLCMay 2024 → May 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
724434-98DrillHadaway Consult and Engineer,llcOct 25, 2011Sep 21, 2011Oct 1, 20117,500
724434-99DrillHadaway Consult and Engineer,llcSep 16, 2011Sep 21, 2011Oct 1, 20117,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 10, 2012Cleveland 107 O-14-8894Glazier NW. (Tonkawa)BE Anadarko II LLCNO Production · shut in Jul 1, 20257,472

Formation tops

As filed on W-2/G-1. Subsea from 2,758 ft elevation.Download CSV →

FormationMD ftSubsea
PennsylvanianPENN SHALE5,511-2,753
Douglas6,896-4,138
Tonkawa7,452-4,694

Perforations

Perforated and open-hole intervals.

FromToType
7,73011,733Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,78012.25890 S
77,7308.75290 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 29, 2014Jun 17, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29533767, documented in the API reference.