TEXAS · WELLS · LIPSCOMB COUNTY · MAY 163 LEASE · API 42-295-33900 · DISTRICT 08

May 163 #1H

Y

Lipscomb County · Lipscomb (Cleveland) field · Producing  · Horizontal

May 163 #1H (API 42-295-33900) is a horizontal well in Lipscomb County operated by BE Anadarko II LLC, completed November 21, 2012 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued August 13, 2012, permitted to 8,590 ft.

It was permitted by Le Norman Operating LLC and has since transferred to BE Anadarko II LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Hogshooter, Checkerboard, Cleveland.

Its lease has reported 144K barrels of oil and 751K mcf of gas since November 2012, last reporting in July 2026.

Operator of record

BE Anadarko II LLC

Permitted by Le Norman Operating LLC; the EWA schedule now lists a different operator.

Based in
Austin, TX
P-5 status
Active (A)
P-5 last filed
Nov 19, 2025
Permits on file
2
Phone
(917) 204-3126

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBE Anadarko II LLC
Production reportsBE Anadarko II, LLCthrough Apr 2026
Latest permitLe Norman Operating LLCAug 13, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,590
total depth, ft
1
permits on file
Aug 13, 2012
last permit issued
Nov 21, 2012
completed
144K
cumulative oil, bbl
751K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2012 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 21, 2012
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Delinquent (D)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
May 163 O-14-8849Lipscomb (Cleveland)BE Anadarko II, LLC1144K751KNov 2012 – Jul 2026

Gas, mcf lease total

Last 12 months 30,027 · prior 12 31,488(-5%)

02K4K202420252026

Oil, barrels lease total

Last 12 months 2,841 · prior 12 2,934(-3%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Le Norman Operating LLCNov 2012 → Mar 2013
  2. 2Sabine Oil & Gas LLCApr 2013 → Nov 2013
  3. 3Jones Energy, LLCDec 2013 → Oct 2020
  4. 4Revolution Operating Company,llcNov 2020 → Mar 2024
  5. 5BE Anadarko II, LLCApr 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
745859-99DrillLe Norman Operating LLCAug 3, 2012Aug 13, 2012Sep 25, 20129,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 21, 2012May 163 O-14-8849Lipscomb (Cleveland)BE Anadarko II LLCProducing8,590

Formation tops

As filed on W-2/G-1. Subsea from 2,652 ft elevation.Download CSV →

FormationMD ftSubsea
Hogshooter8,156-5,504
Checkerboard8,298-5,646
Cleveland8,492-5,840

Perforations

Perforated and open-hole intervals.

FromToType
9,07813,280Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,52112.25816 S
79,0788.75600 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 2, 2014Feb 20, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29533900, documented in the API reference.