TEXAS · WELLS · LIPSCOMB COUNTY · FOSTER-FOSTER UNIT SA 248 LEASE · API 42-295-34165 · DISTRICT 08
Foster-Foster Unit SA 248 #1H
Lipscomb County · Lipscomb S.E. (Cleveland) field · Producing · Horizontal
Foster-Foster Unit SA 248 #1H (API 42-295-34165) is a horizontal well in Lipscomb County operated by BE Anadarko II LLC, completed November 3, 2014 and listed as producing on the RRC schedule, shut in November 1, 2015.
The RRC has issued one drilling permit, issued June 18, 2014, permitted to 8,507 ft.
It was permitted by Jones Energy, LLC and has since transferred to BE Anadarko II LLC on the wellbore schedule.
Completion filings report 10 formation tops, including Brown Dolomite, Hugoton - H2s Corrosive, Douglas, Tonkawa.
Its lease has reported 10.8K barrels of oil and 235K mcf of gas since November 2014, last reporting volume in April 2026.
Operator of record
Permitted by Jones Energy, LLC; the EWA schedule now lists a different operator.
- Based in
- Austin, TX
- P-5 status
- Active (A)
- P-5 last filed
- Nov 19, 2025
- Permits on file
- 2
- Phone
- (917) 204-3126
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | BE Anadarko II LLC |
| Production reports | BE Anadarko II, LLCthrough Apr 2026 |
| Latest permit | Jones Energy, LLCJun 18, 2014 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,507
- total depth, ft
- 1
- permits on file
- Jun 18, 2014
- last permit issued
- Nov 3, 2014
- completed
- 10.8K
- cumulative oil, bbl
- 235K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2014 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Nov 3, 2014
- Shut in
- Nov 1, 2015
- Plugged
- —
Operator's P-5 on the schedule: Delinquent (D)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Foster-Foster Unit SA 248 G-14-282637 | Lipscomb, S.E. (Cleveland) | BE Anadarko II, LLC | 1 | 10.8K | 235K | Nov 2014 – Apr 2026 |
Gas, mcf lease total
Last 12 months 34,121 · prior 12 36,350(-6%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Jones Energy, LLCNov 2014 → Oct 2020
- 2Revolution Operating Company,llcNov 2020 → Mar 2024
- 3BE Anadarko II, LLCApr 2024 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 788024-99 | Drill | Jones Energy, LLC | May 28, 2014 | Jun 18, 2014 | Jun 20, 2014 | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Nov 3, 2014 | Foster-Foster Unit SA 248 G-14-282637 | Lipscomb S.E. (Cleveland) | BE Anadarko II LLC | Producing · shut in Nov 1, 2015 | 8,507 |
Formation tops
As filed on W-2/G-1. Subsea from 2,660 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Brown DolomiteBROWN DOLOMITE - PRESSURED AND C | 3,736 | -1,076 |
| Hugoton - H2S Corrosive | 5,349 | -2,689 |
| Douglas | 6,531 | -3,871 |
| Tonkawa | 7,297 | -4,637 |
| Cottage Grove | 7,954 | -5,294 |
| Cleveland | 8,412 | -5,752 |
| Cherokee | — | — |
| Granite Washes | — | — |
| Hepler | — | — |
| MarmatonMARMATON (DES MOINES) | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,943 | 12,641 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 760 | 12.25 | 465 S |
| 7 | 8,814 | 8.75 | 495 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 6, 2017 | Aug 18, 2015 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-295-34165 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-295-34165 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/29534165, documented in the API reference.