WELL · 42-297-31866 · DISTRICT 2

Geffert Gas Unit #1

N

Live Oak County · George West W-SW (8400) field  · Vertical

Geffert Gas Unit #1 (API 42-297-31866) is a well in Live Oak County operated by Sanchez-O Brien Oil & Gas Corp., completed January 21, 1979.

The RRC has issued 3 drilling permits between 1978 and 1984, permitted to 12,000 ft.

Completion filings report 2 formation tops, including Queen City, Wilcox.

No lease production has been reported under this well’s leases.

Operator of record

Sanchez-O Brien Oil & Gas Corp.

Based in
Houston, TX
P-5 status
Inactive (I)
P-5 last filed
Aug 14, 1997
Permits on file
493
Phone
(713) 783-8000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSanchez-O Brien Oil & Gas Corp.
Production reportsSandel Operating Companythrough Apr 2026
Latest permitSanchez-O'Brien Oil & Gas Corp.Mar 23, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,000
total depth, ft
3
permits on file
Mar 23, 1984
last permit issued
Jan 21, 1979
completed
0
cumulative oil, bbl
1.81M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 21, 1979
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Geffert Gas Unit No. 2 G-2-112470Fant, S. (Wilcox 11300)Sandel Operating Company101.81MJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 46,084 · prior 12 54,174(-15%)

05K10K15K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sanchez-O'Brien Oil & Gas Corp.Jan 1993 → May 1998
  2. 2Sanchez Oil & Gas CorporationJun 1998 → May 1999
  3. 3Coastal Oil & Gas CorporationJun 1999 → Jun 2001
  4. 4EL Paso Production Oil & Gas Co.Jul 2001 → Jul 2006
  5. 5EL Paso E & P Company, L. P.Aug 2006 → Feb 2008
  6. 6Smith Production Inc.Mar 2008 → Jun 2009
  7. 7Sheridan Production Company, LLCJul 2010 → Jul 2010
  8. 8Sandel Operating CompanyJul 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
233472-99RecompletionSanchez-O'Brien Oil & Gas Corp.Mar 23, 1984Mar 23, 1984—12,000
110541-99OtherSanchez-O'Brien Oil & Gas Corp.Mar 3, 1981Mar 3, 1981—9,150
37146-99DrillSanchez-O'Brien Oil & Gas Corp.Nov 17, 1978Nov 17, 1978Dec 8, 197810,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-112470————

Formation tops

As filed on W-2/G-1. Subsea from 290 ft elevation.Download CSV →

FormationMD ftSubsea
Queen City5,845-5,555
Wilcox7,300-7,010
WilcoxWILCOX 1130011,324-11,034

Perforations

Perforated and open-hole intervals.

FromToType
8,3888,404Perforated
8,6508,666Perforated
8,7508,766Perforated
11,32411,334Perforated
11,32411,366Perforated
11,34011,346Perforated
11,35611,366Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,00614.75800 S
7.6258,0639.778475 S
7.6258,0639.875475 S
2.3758,280——
2.3758,550——
2.87511,4543.875185 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 30, 2021Aug 11, 2021—
00Sep 4, 2009Jul 9, 2008—
00Mar 2, 1987Feb 2, 1987—
00Oct 5, 1984Jun 25, 1984—
00Oct 2, 1984Jun 25, 1984—
00Jan 12, 1984Sep 16, 1981—
00Jan 12, 1984May 11, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29731866, documented in the API reference.