TEXAS · WELLS · LIVE OAK COUNTY · API 42-297-32007 · DISTRICT 02

Hinnant #7

Plugged

Live Oak County · Hinnant (2000) field  · Vertical

Hinnant #7 (API 42-297-32007) is a plugged well in Live Oak County, plugged January 7, 1980, last operated by Texas Oil & Gas Corp..

The RRC has issued 2 drilling permits in 1979, permitted to 6,605 ft.

Operator of record

Texas Oil & Gas Corp.

Based in
Dallas, TX
P-5 status
Inactive (I)
P-5 last filed
Sep 25, 1986
Permits on file
1,344
Phone
(214) 954-2086

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexas Oil & Gas Corp.
Production reportsnone
Latest permitTexas Oil & Gas Corp.Jul 11, 1979
6,605
total depth, ft
2
permits on file
Jul 11, 1979
last permit issued
Jun 25, 1979
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 25, 1979
Shut in
—
Plugged
Jan 7, 1980

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
52636-99RecompletionTexas Oil & Gas Corp.Jul 11, 1979Jul 11, 1979—6,605
41361-99DrillTexas Oil & Gas Corp.Jan 24, 1979Jan 24, 1979Jan 21, 19796,605

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 25, 1979Hinnant G-2-83449Hinnant (2000)Texas Oil & Gas Corp.Plugged—
Apr 5, 1979Hinnant G-2-81852Hinnant (Yegua 1ST)Texas Oil & Gas Corp.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
1,8471,851Perforated
4,9704,976Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,72212.25650 S
2.8756,0127.8751,700 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 12, 1984Jul 9, 1979—
00Jan 12, 1984Apr 18, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29732007, documented in the API reference.