TEXAS · WELLS · LIVE OAK COUNTY · MCCLELLAND LEASE · API 42-297-33239 · DISTRICT 02
McClelland #19
Live Oak County · Oakville (Wilcox Cons.) field · Vertical
Mcclelland #19 (API 42-297-33239) is a plugged well in Live Oak County, plugged July 12, 2023, last operated by Wagner Oil Company.
The RRC has issued one drilling permit, issued October 19, 1982, permitted to 10,200 ft.
It was permitted by Txo Production Corp. and has since transferred to Wagner Oil Company on the wellbore schedule.
Operator of record
Permitted by TXO Production Corp.; the EWA schedule now lists a different operator.
- Based in
- Fort Worth, TX
- P-5 status
- Active (A)
- P-5 last filed
- Dec 23, 2025
- Permits on file
- 278
- Phone
- (817) 335-2222
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Wagner Oil Company |
| Production reports | Cimarex Energy Co. of Coloradothrough Nov 2009 |
| Latest permit | TXO Production Corp.Oct 19, 1982 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,200
- total depth, ft
- 1
- permits on file
- Oct 19, 1982
- last permit issued
- Dec 1, 1982
- completed
- 0
- cumulative oil, bbl
- 260K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2023
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 1, 1982
- Shut in
- —
- Plugged
- Jul 12, 2023
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| McClelland G-2-103095 | Oakville (Wilcox Cons.) | Wagner Oil Company | 1 | 0 | 260K | Jan 1993 – Jul 2023 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Bridge Oil Production Co., Inc.Jan 1993 → Jun 1993
- 2Bridge Oil Company, L. P.Jul 1993 → Sep 1994
- 3Parker & Parsley Development L.POct 1994 → Jan 1995
- 4Parker & Parsley Producing L.P.Feb 1995 → Oct 1997
- 5Pioneer Resources Producing, L.PNov 1997 → Jun 1999
- 6Prize Operating CompanyJul 1999 → Mar 2002
- 7Gruy Petroleum Management Co.Apr 2002 → Apr 2006
- 8Cimarex Energy Co. of ColoradoMay 2006 → Nov 2009
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 174899-99 | Drill | TXO Production Corp. | Oct 19, 1982 | Oct 19, 1982 | Nov 14, 1982 | 10,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Dec 1, 1982 | McClelland G-2-103095 | Oakville (Wilcox Cons.) | Wagner Oil Company | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,872 | 9,902 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,023 | 14.75 | 565 S |
| 7 | 8,131 | 8.75 | 175 S |
| 2.875 | — | 6.125 | 390 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Dec 14, 1982 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-297-33239 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-297-33239 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/29733239, documented in the API reference.