WELL · 42-297-35054 · DISTRICT 2

Hinnant Heirs A #2

Plugged

Live Oak County · Hinnant (2000) field  · Vertical

Hinnant Heirs A #2 (API 42-297-35054) is a plugged well in Live Oak County, plugged June 15, 2020, last operated by Royal Production Company Inc..

The RRC has issued one drilling permit (amended once), issued September 23, 2011, permitted to 5,900 ft.

Completion filings report 15 formation tops, including Miocene (undifferentiated), Het I, Het Ii, Frio.

Operator of record

Royal Production Company Inc.

Based in
Corpus Christ, TX
P-5 status
Active (A)
P-5 last filed
Jan 29, 2026
Permits on file
235
Phone
(361) 888-4792

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRoyal Production Company Inc.
Production reportsRoyal Production Company, Inc.through Aug 2016
Latest permitRoyal Production Company, Inc.Sep 23, 2011
5,900
total depth, ft
2
permits on file
Sep 23, 2011
last permit issued
Sep 8, 2016
completed
0
cumulative oil, bbl
277K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2011 THROUGH Jun 2020

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 8, 2016
Shut in
—
Plugged
Jun 15, 2020

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hinnant Heirs "A" G-2-265099Hinnant (2000)Royal Production Company, Inc.10277KNov 2011 – Jun 2020

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Royal Production Company, Inc.Nov 2011 → Aug 2016

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
724527-98DrillRoyal Production Company, Inc.Sep 28, 2011Sep 23, 2011Oct 3, 20115,900
724527-99DrillRoyal Production Company, Inc.Sep 19, 2011Sep 23, 2011Oct 3, 20115,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-265099————

Formation tops

As filed on W-2/G-1. Subsea from 207 ft elevation.Download CSV →

FormationMD ftSubsea
Miocene (undifferentiated)MIOCENE1,722-1,515
Het I2,300-2,093
Het II2,450-2,243
FrioFRIO - DISPOSAL3,500-3,293
Hockley4,600-4,393
Hockley - Disposal4,600-4,393
JacksonJACKSON-YEGUA - DISPOSAL5,620-5,413
Yegua5,740-5,533
Austin Chalk——
Cook Mountain——
Eagle FordEAGLE FORD - H2S——
EdwardsEDWARDS - H2S——
Queen City——
SligoSLIGO - H2S——
Wilcox——

Perforations

Perforated and open-hole intervals.

FromToType
1,8711,874Perforated
1,9611,968Perforated
2,4802,500Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,58112.25520 S
4.55,9057.8751,244 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 1, 2016Sep 27, 2016—
00Nov 1, 2012Feb 14, 2012—
00Oct 31, 2012Dec 22, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
217K
bbl, all reported
Nov 2020
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000114204H-1 InjectionPlugged Jul 13, 20201,0001,2002,400–2,850

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 31,461(-100%)

05K10K20192020

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29735054, documented in the API reference.