WELL · 42-297-35179 · DISTRICT 2

South Texas Children S Home 01 #05H

Y

Live Oak County · Eagleville (Eagle Ford-2) field · Producing  · Horizontal

South Texas Children S Home 01 #05H (API 42-297-35179) is a horizontal well in Live Oak County operated by Crescent Energy Operating LLC, completed September 20, 2012 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued July 5, 2012, permitted to 21,000 ft.

It was permitted by Pioneer Natural Res. USA, Inc. and has since transferred to Crescent Energy Operating LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Midway, Austin Chalk, Top Efgd.

Its lease has reported 1.34M barrels of oil and 2.21M mcf of gas since January 2012, last reporting in July 2026. The lease carries 9 wells, so these are lease totals, not this well alone.

Operator of record

Crescent Energy Operating LLC

Permitted by Pioneer Natural Res. USA, Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Aug 28, 2025
Permits on file
54
Phone
(713) 337-4600

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCrescent Energy Operating LLC
Production reportsSilverbow Resources Oper, LLCthrough Apr 2026
Latest permitPioneer Natural Res. USA, Inc.Jul 5, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

21,000
total depth, ft
1
permits on file
Jul 5, 2012
last permit issued
Sep 20, 2012
completed
1.34M
cumulative oil, bbl
2.21M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2012 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 20, 2012
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 9 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
South Texas Children's Home 01 O-2-9999Eagleville (Eagle Ford-2)Crescent Energy Operating, LLC91.34M2.21MJan 2012 – Jul 2026

Oil, barrels lease total

Last 12 months 32,930 · prior 12 65,140(-49%)

010K20K30K202420252026

Gas, mcf lease total

Last 12 months 97,702 · prior 12 115,669(-16%)

010K20K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Pioneer Natural Res. USA, Inc.Jan 2012 → Apr 2018
  2. 2Sea Eagle Ford, LLCMay 2018 → Jun 2022
  3. 3Silverbow Resources Oper, LLCJul 2022 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
743898-99DrillPioneer Natural Res. USA, Inc.Jul 2, 2012Jul 5, 2012Jul 6, 201221,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-2-9999————

Formation tops

As filed on W-2/G-1. Subsea from 229 ft elevation.Download CSV →

FormationMD ftSubsea
Midway7,383-7,154
Austin ChalkAUSTIN CHALK, UPPER11,138-10,909
Top Efgd11,387-11,158

Perforations

Perforated and open-hole intervals.

FromToType
11,66615,647Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.62567017.5770 S
9.6258,06012.251,705 S
5.515,7808.51,660 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 16, 2013Oct 25, 2012Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29735179, documented in the API reference.