WELL · 42-297-35231 · DISTRICT 2
Beall #2
Live Oak County · Lagarto Creek (Yegua) field · Vertical
Beall #2 (API 42-297-35231) is a plugged well in Live Oak County, plugged June 25, 2020, last operated by Royal Production Company Inc..
The RRC has issued 2 drilling permits between 2012 and 2013, permitted to 6,575 ft.
Completion filings report 4 formation tops, including Hockley, Yegua, Lagarto, Cook Mountain.
Operator of record
- Based in
- Corpus Christ, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jan 29, 2026
- Permits on file
- 235
- Phone
- (361) 888-4792
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Royal Production Company Inc. |
| Production reports | Royal Production Company, Inc.through May 2020 |
| Latest permit | Royal Production Company, Inc.Aug 14, 2013 |
- 6,575
- total depth, ft
- 2
- permits on file
- Aug 14, 2013
- last permit issued
- Aug 16, 2013
- completed
- 0
- cumulative oil, bbl
- 391K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2013 THROUGH Jun 2020
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 16, 2013
- Shut in
- —
- Plugged
- Jun 25, 2020
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Beall G-2-272483 | Lagarto Creek (Yegua) | Royal Production Company, Inc. | 1 | 0 | 277K | Aug 2013 – Jun 2020 |
| Beall G-2-269253 | Lagarto (Yegua 6050) | Royal Production Company, Inc. | 1 | 0 | 113K | Jan 2013 – Oct 2013 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Royal Production Company, Inc.Jan 2013 → May 2020
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 767897-99 | Recompletion | Royal Production Company, Inc. | Aug 8, 2013 | Aug 14, 2013 | Aug 14, 2013 | 6,332 |
| 749696-99 | Drill | Royal Production Company, Inc. | Oct 10, 2012 | Oct 17, 2012 | Oct 28, 2012 | 6,575 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-269253 | — | — | — | — |
| — | — G-2-272483 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 108 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Hockley | 4,790 | -4,682 |
| Yegua | 5,995 | -5,887 |
| LagartoLAGARTO (YEGUA 6050) | 6,050 | -5,942 |
| Cook Mountain | 6,230 | -6,122 |
| LagartoLAGARTO CREEK (YEGUA) | 6,330 | -6,222 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,233 | 6,255 | Perforated |
| 6,378 | 6,382 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,736 | 12.25 | 569 S |
| 4.5 | 6,575 | 7.875 | 679 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 24, 2014 | Nov 14, 2013 | — |
| 00 | Aug 13, 2013 | Feb 21, 2013 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-297-35231 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-297-35231 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/29735231, documented in the API reference.