WELL · 42-301-30202 · DISTRICT 8
Robinson 1 #1 D
Loving County · Red Bluff (Wolfcamp) field · Vertical
Robinson 1 #1 D (API 42-301-30202) is a plugged well in Loving County, plugged August 18, 1995, last operated by Brown H. L. JR..
The RRC has issued 2 drilling permits between 1978 and 1983, permitted to 5,500 ft.
Completion filings report 3 formation tops, including Lamar, Bell Canyon, Cherry Canyon.
Operator of record
- Based in
- Midland, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Jan 17, 2001
- Permits on file
- 195
- Phone
- (432) 683-5216
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Brown, H. L., Jr.Sep 21, 1983 |
- 5,500
- total depth, ft
- 2
- permits on file
- Sep 21, 1983
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 1995
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Aug 18, 1995
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Robinson 1 G-10-119083 | Red Bluff (Wolfcamp) | Brown, H. L., Jr. | 1 | 0 | 0 | Jan 1993 – Aug 1995 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 213543-99 | Other | Brown, H. L., Jr. | Aug 31, 1983 | Sep 21, 1983 | — | 4,600 |
| 17415-99 | Drill | EL Paso Natural Gas Co. | Feb 1, 1978 | Feb 1, 1978 | Feb 3, 1978 | 5,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | Robinson 1 G-10-119083 | Red Bluff (Wolfcamp) | Brown H. L. Jr. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,933 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Lamar | 3,340 | -407 |
| Bell Canyon | 3,372 | -439 |
| Cherry Canyon | 4,285 | -1,352 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,330 | 4,530 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 989 | 11 | 780 S |
| 4.5 | 4,656 | 7.875 | 47 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 19, 1985 | Nov 25, 1985 | — |
| 00 | Dec 10, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-301-30202 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-301-30202 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 70.2K
- bbl, last 12 reported months
- 2.1M
- bbl, all reported
- Nov 1995
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000060381 | W-14 Disposal | Plugged Aug 29, 1995 | 800 | 1,000 | 4,330–4,530 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 70,208 · prior 12 229,515(-69%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/30130202, documented in the API reference.