WELL · 42-301-30268 · DISTRICT 8
Rendova-State #1
Loving County · Vertical
Rendova-State #1 (API 42-301-30268) is a plugged well in Loving County, plugged August 8, 1981, last operated by Seco Production Company.
The RRC has issued 2 drilling permits between 1980 and 1990, permitted to 16,545 ft.
Completion filings report 3 formation tops, including Rustler, Bell Canyon, Cherry Canyon.
Operator of record
Midland, TX · P-5 Y, filed Feb 4, 2000 · 5 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Seco Production CompanyDec 3, 1990 |
- 16,545
- total depth, ft
- 2
- permits on file
- Dec 3, 1990
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2019
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Aug 8, 1981
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Rendova State O-10-38547 | Dimmitt (Delaware Cons) | Boaz Energy II Operating, LLC | 1 | 0 | 0 | Jul 2007 – Apr 2019 |
| Rendova-State O-10-33122 | Dimmitt (Cherry Canyon) | Ica Energy Operating, L.L.C. | 1 | 0 | 0 | Jan 1993 – Feb 2008 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 381802-99 | Reenter | Seco Production Company | Dec 3, 1990 | Dec 3, 1990 | Dec 8, 1990 | 7,000 |
| 92038-99 | Drill | HCW Exploration, Inc. | Sep 9, 1980 | Sep 9, 1980 | — | 16,545 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-33122 | — | — | — | — |
| — | — O-10-38547 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,051 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Rustler | 609 | 2,442 |
| Bell Canyon | 4,900 | -1,849 |
| Bell Canyon | 4,998 | -1,947 |
| Cherry Canyon | 5,900 | -2,849 |
| Cherry Canyon | 6,541 | -3,490 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,650 | 6,722 | Perforated |
| 6,551 | 6,722 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 4,985 | 17.5 | 4,100 S |
| 9.625 | 12,550 | 12.25 | 4,166 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 14, 2008 | Jan 28, 1994 | — |
| 00 | Apr 7, 1994 | Jan 28, 1994 | — |
| 00 | May 24, 1991 | Feb 1, 1991 | — |
| 00 | May 2, 1991 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-301-30268 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-301-30268 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 23.2M
- bbl, all reported
- Apr 2019
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000077911 | H-1 Injection | Plugged Jan 24, 2019 | 5,000 | 1,500 | 5,600–10,000 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/30130268, documented in the API reference.