TEXAS · WELLS · LOVING COUNTY · API 42-301-31062 · DISTRICT 7B

TXL 33 #1

Plugged

Loving County · Dimmitt (Delaware Cons) field  · Horizontal · Sidetrack

Txl 33 #1 (API 42-301-31062) is a plugged horizontal well in Loving County, plugged January 6, 2021, last operated by Great Western Drilling Company.

The RRC has issued 2 drilling permits between 1996 and 1997, permitted to 7,800 ft.

Completion filings report 3 formation tops, including Delaware, Cherry Canyon, Brushy Canyon.

Its 2 leases have reported 38K barrels of oil and 99.7K mcf of gas since January 1997, last reporting in March 2023. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Great Western Drilling Company

Based in
Midland, TX
P-5 status
Inactive (I)
P-5 last filed
Apr 17, 2024
Permits on file
408
Phone
(432) 682-5241

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGreat Western Drilling Company
Production reportsGreat Western Drilling Companythrough Nov 2020
Latest permitGreat Western Drlg. Co.Jul 24, 1997
7,800
total depth, ft
2
permits on file
Jul 24, 1997
last permit issued
Aug 8, 1997
completed
38K
cumulative oil, bbl
99.7K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1997 THROUGH Mar 2023

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 8, 1997
Shut in
—
Plugged
Jan 6, 2021

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
TXL 33 O-10-38251Dimmitt (Delaware Cons)Great Western Drilling Company110.8K24.7KJul 2007 – Mar 2023
TXL 33 O-10-35235Dimmitt (Cherry Canyon)Great Western Drilling Company127.3K75KJan 1997 – Nov 2007

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Great Western Drilling CompanyJan 1997 → Nov 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
465164-99Recompletion · sidetrackGreat Western Drlg. Co.Jul 21, 1997Jul 24, 1997Jul 28, 19976,500
452998-99DrillGreat Western Drlg. Co.Sep 23, 1996Sep 24, 1996Oct 9, 19967,800

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 8, 1997TXL 33 O-10-38251Dimmitt (Delaware Cons)Great Western Drilling CompanyPlugged—
Aug 8, 1997TXL 33 O-10-38251Dimmitt (Delaware Cons)Great Western Drilling CompanyPlugged—
Aug 8, 1997TXL 33 O-10-35235Dimmitt (Cherry Canyon)Great Western Drilling CompanyPlugged—
Aug 8, 1997TXL 33 O-10-35235Dimmitt (Cherry Canyon)Great Western Drilling CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 2,867 ft elevation.Download CSV →

FormationMD ftSubsea
DelawareDELAWARE LIME4,590-1,723
DelawareDELAWARE LM.4,590-1,723
Cherry Canyon5,588-2,721
Brushy Canyon6,819-3,952

Perforations

Perforated and open-hole intervals.

FromToType
6,2246,240Perforated
6,2347,628Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,04012.2555 S
5.57,4257.8752,227 S
5.57,5257.8752,225 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 16, 2007Aug 29, 1997Yes
00Nov 19, 1997Aug 29, 1997Yes
00Apr 8, 1997Feb 18, 1997Yes
00Mar 25, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/30131062, documented in the API reference.