WELL · 42-301-31548 · DISTRICT 8

Blacktip 1-44 #1H

Y

Loving County · Sandbar (Bone Spring) field · Producing  · Horizontal

Blacktip 1-44 #1H (API 42-301-31548) is a horizontal well in Loving County operated by Anadarko E&P Onshore LLC, completed October 15, 2010 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 2010 and 2017, permitted to 11,067 ft.

Completion filings report one formation top, including Bone Spring.

Its 2 leases have reported 775K barrels of oil and 1.68M mcf of gas since October 2010, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Anadarko E&P Onshore LLC

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Oct 22, 2025
Permits on file
4,575
Phone
(713) 215-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAnadarko E&P Onshore LLC
Production reportsAnadarko E&P Onshore LLCthrough Apr 2026
Latest permitAnadarko E&P Onshore LLCMar 29, 2017
11,067
total depth, ft
2
permits on file
Mar 29, 2017
last permit issued
Oct 15, 2010
completed
775K
cumulative oil, bbl
1.68M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2010 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 15, 2010
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Blacktip 1-44 O-10-40625Phantom (Wolfcamp)Anadarko E&P Onshore LLC2667K1.5MOct 2010 – Jul 2026
Blacktip 1-44 O-10-48389Sandbar (Bone Spring)Anadarko E&P Onshore LLC1108K178KNov 2016 – Jul 2026

Oil, barrels lease total

Last 12 months 30,593 · prior 12 13,432(+128%)

05K10K202420252026

Gas, mcf lease total

Last 12 months 17,384 · prior 12 18,506(-6%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Anadarko Petroleum CorporationOct 2010 → Mar 2013
  2. 2Anadarko E&P Onshore LLCApr 2013 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
824539-99Field transferAnadarko E&P Onshore LLCMar 16, 2017Mar 29, 2017Jul 31, 201016,000
696844-99DrillAnadarko Petroleum CorporationJun 1, 2010Jun 3, 2010Aug 1, 201016,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 15, 2010Blacktip 1-44 O-10-48389Sandbar (Bone Spring)Anadarko E&P Onshore LLCProducing11,067
Oct 15, 2010Blacktip 1-44 O-10-40625Phantom (Wolfcamp)Anadarko E&P Onshore LLCNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 2,755 ft elevation.Download CSV →

FormationMD ftSubsea
Bone SpringBONE SPRING 19,256-6,501
Bone SpringBONE SPRINGS 19,256-6,501
Bone SpringBONE SPRING 29,884-7,129
Bone SpringBONE SPRINGS 29,884-7,129
Bone SpringBONE SPRING 310,666-7,911
Bone SpringBONE SPRINGS 310,666-7,911

Perforations

Perforated and open-hole intervals.

FromToType
11,53614,888Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,01417.51,000 S
9.6254,82512.251,980 S
711,2338.7511,233 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 25, 2017Mar 30, 2017Yes
00Apr 21, 2011Nov 8, 2010Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/30131548, documented in the API reference.