TEXAS · WELLS · LOVING COUNTY · CBR 18 LEASE · API 42-301-32081 · DISTRICT 7B
CBR 18 #2H
Loving County · Sandbar (Bone Spring) field · Horizontal
Cbr 18 #2H (API 42-301-32081) is a plugged horizontal well in Loving County, plugged September 10, 2024, last operated by Wpx Energy Permian LLC.
The RRC has issued one drilling permit, issued November 27, 2013, permitted to 16,000 ft.
It was permitted by Rki Exploration & Production LLC and has since transferred to Wpx Energy Permian LLC on the wellbore schedule.
Completion filings report 4 formation tops, including Bell Canyon, Cherry Canyon, Brushy Canyon, Bone Spring.
Its lease has reported 21.7K barrels of oil and 630K mcf of gas since October 2012, last reporting in October 2024. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by RKI Exploration & Production LLC; the EWA schedule now lists a different operator.
- Based in
- Oklahoma City, OK
- P-5 status
- Active (A)
- P-5 last filed
- Oct 22, 2025
- Permits on file
- 956
- Phone
- (405) 235-3611
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | WPX Energy Permian LLC |
| Production reports | RKI Exploration & Production LLCthrough May 2015 |
| Latest permit | RKI Exploration & Production LLCNov 27, 2013 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 16,000
- total depth, ft
- 1
- permits on file
- Nov 27, 2013
- last permit issued
- Dec 31, 2013
- completed
- 21.7K
- cumulative oil, bbl
- 630K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2012 THROUGH Oct 2024
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 31, 2013
- Shut in
- —
- Plugged
- Sep 10, 2024
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| CBR 18 O-10-44390 | Sandbar (Bone Spring) | WPX Energy Permian, LLC | 2 | 21.7K | 630K | Oct 2012 – Oct 2024 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1RKI Exploration & Production LLCOct 2012 → May 2015
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 774114-99 | Drill | RKI Exploration & Production LLC | Nov 19, 2013 | Nov 27, 2013 | Dec 5, 2013 | 16,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Dec 31, 2013 | CBR 18 O-10-44390 | Sandbar (Bone Spring) | WPX Energy Permian LLC | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,912 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Bell Canyon | 3,229 | -317 |
| Cherry Canyon | 4,314 | -1,402 |
| Brushy Canyon | 5,395 | -2,483 |
| Bone Spring | 7,078 | -4,166 |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 894 | 17.5 | 750 S |
| 9.625 | 3,250 | 12.25 | 1,200 S |
| 5.5 | 12,431 | 8.75 | 1,705 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 10, 2017 | Oct 27, 2017 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-301-32081 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-301-32081 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/30132081, documented in the API reference.