TEXAS · WELLS · LOVING COUNTY · JOHNSON ESTATE 57-T1-4 LEASE · API 42-301-32121 · DISTRICT 7B

Johnson Estate 57-T1-4 #1H

Y

Loving County · Phantom (Wolfcamp) field · Producing  · Horizontal

Johnson Estate 57-T1-4 #1H (API 42-301-32121) is a horizontal well in Loving County operated by Bpx Operating Company, completed June 7, 2014 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued February 14, 2014, permitted to 10,068 ft.

It was permitted by Bhp Billiton Pet(Txla OP) CO and has since transferred to Bpx Operating Company on the wellbore schedule.

Completion filings report 7 formation tops, including Delaware, Cherry Canyon, Red Bluff, Bell Canyon.

No lease production has been reported under this well’s leases.

Operator of record

BPX Operating Company

Permitted by BHP Billiton Pet(txla OP) Co; the EWA schedule now lists a different operator.

Based in
Denver, CO
P-5 status
Active – Extension (X)
P-5 last filed
Jun 24, 2026
Permits on file
1,576
Phone
(720) 439-5104

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBPX Operating Company
Production reportsBPX Operating Companythrough Apr 2026
Latest permitBHP Billiton Pet(txla OP) CoFeb 14, 2014

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,068
total depth, ft
1
permits on file
Feb 14, 2014
last permit issued
Jun 7, 2014
completed
0
cumulative oil, bbl
1.79M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2014 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 7, 2014
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Johnson Estate 57-T1-4 G-10-278221Phantom (Wolfcamp)BPX Operating Company101.79MJun 2014 – Jul 2026

Gas, mcf lease total

Last 12 months 180,426 · prior 12 150,164(+20%)

010K20K30K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1BHP Billiton Pet(txla OP) CoJun 2014 → Jul 2019
  2. 2BPX Operating CompanyAug 2019 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
778215-99DrillBHP Billiton Pet(txla OP) CoJan 27, 2014Feb 14, 2014Mar 5, 201414,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 7, 2014Johnson Estate 57-T1-4 G-10-278221Phantom (Wolfcamp)BPX Operating CompanyProducing10,068

Formation tops

As filed on W-2/G-1. Subsea from 2,873 ft elevation.Download CSV →

FormationMD ftSubsea
Delaware3,000-127
Cherry Canyon3,700-827
Red Bluff3,900-1,027
Bell Canyon4,700-1,827
Brushy Canyon6,000-3,127
Bone SpringBONE SPRINGS6,700-3,827
AvalonAVALON SHALE7,170-4,297
Bone Spring1ST BONE SPRING SAND7,740-4,867
Bone Spring2ND BONE SPRING SAND8,440-5,567
Bone Spring3RD BONE SPRING SAND9,410-6,537

Perforations

Perforated and open-hole intervals.

FromToType
10,20514,760Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
11.752,88914.753,961 S
8.6259,81010.625715 S
5.514,9687.8751,219 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 27, 2015Jun 15, 2015Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/30132121, documented in the API reference.