WELL · 42-301-32399 · DISTRICT 8
Norton-Schaub 84-TTT-B33 WF #2010H
Loving County · Phantom (Wolfcamp) field · Horizontal
Norton-Schaub 84-Ttt-B33 WF #2010H (API 42-301-32399) is a horizontal well in Loving County operated by Matador Production Company, completed August 6, 2015.
The RRC has issued one drilling permit (amended once), issued October 16, 2014, permitted to 14,000 ft.
Completion filings report 10 formation tops, including Bell Canyon, Red Bluff, Brushy Canyon, Cherry Canyon.
Its 2 leases have reported 675K barrels of oil and 2.11M mcf of gas since July 2014, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.
Operator of record
Dallas, TX · P-5 Y, filed Jul 4, 2026 · 569 permits on file · (972) 371-5200
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Matador Production Company |
| Production reports | Matador Production Companythrough Apr 2026 |
| Latest permit | Matador Production CompanyOct 16, 2014 |
- 14,000
- total depth, ft
- 2
- permits on file
- Oct 16, 2014
- last permit issued
- Aug 6, 2015
- completed
- 675K
- cumulative oil, bbl
- 2.11M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2014 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 6, 2015
- Shut in
- —
- Plugged
- —
Surface location
31.717677, -103.621636
OpenStreetMap → · Google Maps →
Permit surface location from the RRC GIS record, in Loving County.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Norton-Schaub 84-TTT-B33 WF O-10-45854 | Phantom (Wolfcamp) | Matador Production Company | 2 | 653K | 2.03M | Jul 2014 – Jul 2026 |
| Norton-Schaub 84 TTT B33 Alloc O-10-55799 | Phantom (Wolfcamp) | Matador Production Company | 1 | 21.6K | 80.6K | Apr 2021 – Jul 2026 |
Oil, barrels lease total
Last 12 months 10,512 · prior 12 10,597(-1%)
Gas, mcf lease total
Last 12 months 49,801 · prior 12 29,602(+68%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Matador Production CompanyJul 2014 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 798072-98 | Drill | Matador Production Company | Apr 14, 2021 | Oct 16, 2014 | Oct 19, 2014 | 14,000 |
| 798072-99 | Drill | Matador Production Company | Oct 9, 2014 | Oct 16, 2014 | Oct 19, 2014 | 14,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-45854 | — | — | — | — |
| — | — O-10-55799 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,697 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Bell Canyon | 2,940 | -243 |
| Red Bluff | 2,940 | -243 |
| Bell Canyon | 4,255 | -1,558 |
| Brushy Canyon | 4,255 | -1,558 |
| Brushy Canyon | 5,150 | -2,453 |
| Cherry Canyon | 6,800 | -4,103 |
| Bone SpringBONE SPRINGS | 7,809 | -5,112 |
| Wolfcamp | 10,619 | -7,922 |
| AtokaATOKA - HIGH PRESSURE | — | — |
| Delaware | — | — |
| Pennsylvanian | — | — |
| Red Bluff | — | — |
| Strawn | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,205 | 16,469 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 717 | 17.5 | 750 S |
| 9.625 | 4,325 | 12.25 | 1,400 S |
| 7 | 11,150 | 8.75 | 911 S |
| 4.5 | 16,580 | 6.125 | 581 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 21, 2021 | Mar 16, 2021 | — |
| 00 | Dec 28, 2015 | Oct 2, 2015 | — |
| 00 | Aug 20, 2015 | Jul 24, 2015 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-301-32399 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-301-32399 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
Nearby wells and their tops
NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM
Draw a cross-section
This well's tops beside its 5 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.
Lonestar 84-TTT-B33 WF42-301-33559
0.5 KM · Matador Production Company · Section with this well →
| Red Bluff | 1,000 | 1,695 |
| Delaware | 4,214 | -1,519 |
| Bell Canyon | 4,214 | -1,519 |
| Cherry Canyon | 5,382 | -2,687 |
| Brushy Canyon | 6,388 | -3,693 |
| Bone Spring | 7,815 | -5,120 |
| Wolfcamp | 10,723 | -8,028 |
| Strawn | — |
10 TOPS · FIRST 8
Kerr 83-TTT-B33 WF SA42-301-33450
1.0 KM · Matador Production Company · Section with this well →
| Red Bluff | 1,000 | 1,693 |
| Delaware | 4,271 | -1,578 |
| Bell Canyon | 4,305 | -1,612 |
| Cherry Canyon | 5,267 | -2,574 |
| Brushy Canyon | 6,552 | -3,859 |
| Bone Spring | 7,879 | -5,186 |
| Wolfcamp | 10,732 | -8,039 |
| Strawn | — |
10 TOPS · FIRST 8
Kerr 83-TTT-B33 WF SA 242-301-33452
1.0 KM · Matador Production Company · Section with this well →
| Red Bluff | 1,000 | 1,693 |
| Bell Canyon | 4,209 | -1,516 |
| Delaware | 4,256 | -1,563 |
| Cherry Canyon | 5,256 | -2,563 |
| Brushy Canyon | 6,541 | -3,848 |
| Bone Spring | 7,864 | -5,171 |
| Wolfcamp | 10,717 | -8,024 |
| Strawn | — |
10 TOPS · FIRST 8
Howard Posner 83-TTT-B33 SA 203H42-301-33980
1.0 KM · Matador Production Company · Section with this well →
| Red Bluff | 1,020 | 1,673 |
| Delaware | 4,223 | -1,530 |
| Bell Canyon | 4,223 | -1,530 |
| Cherry Canyon | 5,383 | -2,690 |
| Brushy Canyon | 6,376 | -3,683 |
| Bone Spring | 7,822 | -5,129 |
| Wolfcamp | 10,737 | -8,044 |
| Atoka | — |
10 TOPS · FIRST 8
Howard Posner 83-TTT-B33 SA 204H42-301-33981
1.0 KM · Matador Production Company · Section with this well →
| Red Bluff | 1,020 | 1,673 |
| Bell Canyon | 4,140 | -1,447 |
| Delaware | 4,140 | -1,447 |
| Cherry Canyon | 5,112 | -2,419 |
| Brushy Canyon | 6,472 | -3,779 |
| Bone Spring | 7,774 | -5,081 |
| Wolfcamp | 10,725 | -8,032 |
| Atoka | — |
10 TOPS · FIRST 8
Wheat Ramsey -A-42-301-30405
2.0 KM · Walsh & Watts, Inc. · Section with this well →
| Delaware | 4,208 | -1,523 |
| Cherry Canyon | 5,198 | -2,513 |
Carthel 31-TTT-B02 WF42-301-37133
2.1 KM · Matador Production Company · Section with this well →
| Red Bluff | 1,000 | 1,674 |
| Bell Canyon | 4,206 | -1,532 |
| Delaware | 4,206 | -1,532 |
| Cherry Canyon | 5,394 | -2,720 |
| Brushy Canyon | 6,420 | -3,746 |
| Bone Spring | 7,757 | -5,083 |
| Bone Spring | 8,645 | -5,971 |
| Bone Spring | 9,214 | -6,540 |
10 TOPS · FIRST 8
Carthel 31-TTT-B02 WF42-301-37136
2.1 KM · Matador Production Company · Section with this well →
| Red Bluff | 1,000 | 1,674 |
| Bell Canyon | 4,205 | -1,531 |
| Delaware | 4,205 | -1,531 |
| Cherry Canyon | 4,343 | -1,669 |
| Brushy Canyon | 6,339 | -3,665 |
| Bone Spring | 7,756 | -5,082 |
| Bone Spring | 8,654 | -5,980 |
| Bone Spring | 8,951 | -6,277 |
10 TOPS · FIRST 8
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/30132399, documented in the API reference.