TEXAS · WELLS · LOVING COUNTY · LEIMAN WEST LEASE · API 42-301-32466 · DISTRICT 7B
Leiman West #3H
Loving County · Phantom (Wolfcamp) field · Producing · Horizontal
- Fields on the latest permit · any of 2
- Phantom (Wolfcamp) · Two Georges (Bone Spring)
- Not one formation; the well must be completed in one of them, and no target formation is stated.
Leiman West #3H (API 42-301-32466) is a horizontal well in Loving County operated by Cog Operating LLC, completed May 12, 2016 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued December 1, 2014, permitted to 12,352 ft.
It was permitted by Silver Hill Energy Partners, LLC and has since transferred to Cog Operating LLC on the wellbore schedule.
Completion filings report 10 formation tops, including Red Bluff, Bell Canyon, Delaware, Cherry Canyon.
Its lease has reported 466K barrels of oil and 789K mcf of gas since May 2016, last reporting volume in April 2026.
Operator of record
Permitted by Silver Hill Energy Partners, LLC; the EWA schedule now lists a different operator.
- Based in
- Midland, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Jun 2, 2026
- Permits on file
- 4,568
- Phone
- (432) 683-7443
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | COG Operating LLC |
| Production reports | COG Operating LLCthrough Apr 2026 |
| Latest permit | Silver Hill Energy Partners, LLCDec 1, 2014 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,352
- total depth, ft
- 1
- permits on file
- Dec 1, 2014
- last permit issued
- May 12, 2016
- completed
- 466K
- cumulative oil, bbl
- 789K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 2016 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- May 12, 2016
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Leiman West O-10-47820 | Phantom (Wolfcamp) | COG Operating LLC | 1 | 466K | 789K | May 2016 – Apr 2026 |
Oil, barrels lease total
Last 12 months 16,796 · prior 12 14,746(+14%)
Gas, mcf lease total
Last 12 months 27,676 · prior 12 22,944(+21%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Silver Hill Energy Partners, LLCMay 2016 → Feb 2017
- 2RSP Permian, LLCMar 2017 → Jul 2018
- 3COG Operating LLCAug 2018 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 800906-99 | Drill | Silver Hill Energy Partners, LLC | Nov 25, 2014 | Dec 1, 2014 | Mar 1, 2016 | 13,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| May 12, 2016 | Leiman West O-10-47820 | Phantom (Wolfcamp) | COG Operating LLC | Producing | 12,352 |
Formation tops
As filed on W-2/G-1. Subsea from 3,144 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Red Bluff | 3,900 | -756 |
| Bell Canyon | 5,241 | -2,097 |
| Delaware | 5,241 | -2,097 |
| Cherry Canyon | 6,486 | -3,342 |
| Brushy Canyon | 7,619 | -4,475 |
| Bone SpringBONE SPRINGS | 9,143 | -5,999 |
| Wolfcamp | 12,100 | -8,956 |
| AtokaATOKA - HIGH PRESSURE | — | — |
| Pennsylvanian | — | — |
| Red Bluff | — | — |
| Strawn | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 12,711 | 16,706 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 481 | 17.5 | 395 S |
| 9.625 | 5,198 | 12.25 | 1,600 S |
| 7 | 12,482 | 8.75 | 790 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 1, 2018 | Apr 12, 2018 | Yes |
| 00 | Aug 31, 2016 | Jul 22, 2016 | — |
| 00 | Aug 9, 2016 | Jul 21, 2016 | Yes |
Well logs
1 log loaded from the RRC's log index, the latest received May 1, 2019. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.
Open the RRC's log search for this well ↗| Logas described | Files | Intervalft, as filed | Datereceived | SizeMB |
|---|---|---|---|---|
| OtherSpans Red Bluff, Bell Canyon, Delaware, Cherry Canyon, Brushy Canyon, Bone Spring, Wolfcamp | TIFF | 5,190 to 12,246 | May 1, 2019 | 37.0 |
"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-301-32466 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-301-32466 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it. The University Lands library has no per-well link: then paste it into its search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/30132466, documented in the API reference.