WELL · 42-301-32608 · DISTRICT 8

Jackson Trust C 12-TTT-C24 NL #121H

Y

Loving County · Sandbar (Bone Spring) field · Producing  · Horizontal

Jackson Trust C 12-Ttt-C24 NL #121H (API 42-301-32608) is a horizontal well in Loving County operated by Matador Production Company, completed November 9, 2015 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended twice), issued May 28, 2015, permitted to 12,000 ft.

Completion filings report 10 formation tops, including Red Bluff, Delaware, Bell Canyon, Cherry Canyon.

Its lease has reported 279K barrels of oil and 1.58M mcf of gas since November 2015, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Matador Production Company

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Sep 30, 2025
Permits on file
569
Phone
(972) 371-5200

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMatador Production Company
Production reportsMatador Production Companythrough Apr 2026
Latest permitMatador Production CompanyMay 28, 2015
12,000
total depth, ft
3
permits on file
May 28, 2015
last permit issued
Nov 9, 2015
completed
279K
cumulative oil, bbl
1.58M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2015 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 9, 2015
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jackson Trust C 12-TTT-C24 NL O-10-48032Sandbar (Bone Spring)Matador Production Company2279K1.58MNov 2015 – Jul 2026

Oil, barrels lease total

Last 12 months 10,669 · prior 12 11,356(-6%)

05001K1.5K202420252026

Gas, mcf lease total

Last 12 months 67,190 · prior 12 64,455(+4%)

05K10K15K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Matador Production CompanyNov 2015 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
806773-97DrillMatador Production CompanyNov 21, 2016May 28, 2015Jul 25, 201510,839
806773-98DrillMatador Production CompanyJul 9, 2015May 28, 2015—12,000
806773-99DrillMatador Production CompanyMay 21, 2015May 28, 2015Jul 25, 201512,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-48032————

Formation tops

As filed on W-2/G-1. Subsea from 3,076 ft elevation.Download CSV →

FormationMD ftSubsea
Red Bluff1,0002,076
Delaware5,243-2,167
Bell Canyon5,263-2,187
Cherry Canyon6,315-3,239
Brushy Canyon7,713-4,637
Bone SpringBONE SPRINGS9,091-6,015
AtokaATOKA - HIGH PRESSURE——
Pennsylvanian——
Strawn——
Wolfcamp——

Perforations

Perforated and open-hole intervals.

FromToType
11,04815,914Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37561517.51,290 S
9.6255,39812.251,708 S
5.516,0548.752,404 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 28, 2018Feb 23, 2018—
00Dec 7, 2016Jul 13, 2016Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/30132608, documented in the API reference.