TEXAS · WELLS · LOVING COUNTY · BILLY BURT 90-TTT-B33 WF LEASE · API 42-301-32649 · DISTRICT 7B

Billy Burt 90-TTT-B33 WF #201H

Y

Loving County · Phantom (Wolfcamp) field · Producing  · Horizontal

Billy Burt 90-Ttt-B33 WF #201H (API 42-301-32649) is a horizontal well in Loving County operated by Matador Production Company, completed January 11, 2018 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued July 16, 2015, permitted to 10,847 ft.

Completion filings report 10 formation tops, including Red Bluff, Delaware, Bell Canyon, Cherry Canyon.

Its lease has reported 1.91M barrels of oil and 6.14M mcf of gas since December 2014, last reporting in July 2026. The lease carries 4 wells, so these are lease totals, not this well alone.

Operator of record

Matador Production Company

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Sep 30, 2025
Permits on file
569
Phone
(972) 371-5200

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMatador Production Company
Production reportsMatador Production Companythrough Apr 2026
Latest permitMatador Production CompanyJul 16, 2015
10,847
total depth, ft
2
permits on file
Jul 16, 2015
last permit issued
Jan 11, 2018
completed
1.91M
cumulative oil, bbl
6.14M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2014 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 11, 2018
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Billy Burt 90-TTT-B33 WF O-10-47373Phantom (Wolfcamp)Matador Production Company41.91M6.14MDec 2014 – Jul 2026

Oil, barrels lease total

Last 12 months 35,911 · prior 12 42,691(-16%)

02K4K6K202420252026

Gas, mcf lease total

Last 12 months 215,599 · prior 12 262,119(-18%)

010K20K30K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Matador Production CompanyDec 2014 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
808228-98DrillMatador Production CompanyAug 12, 2016Jul 16, 2015Jul 19, 201510,847
808228-99DrillMatador Production CompanyJul 8, 2015Jul 16, 2015Jul 19, 201512,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 11, 2018Billy Burt 90-TTT-B33 WF O-10-47373Phantom (Wolfcamp)Matador Production CompanyProducing10,847

Formation tops

As filed on W-2/G-1. Subsea from 2,758 ft elevation.Download CSV →

FormationMD ftSubsea
Red Bluff1,5001,258
Delaware4,000-1,242
Bell Canyon4,057-1,299
Cherry Canyon5,015-2,257
Brushy Canyon6,237-3,479
Bone SpringBONE SPRINGS7,811-5,053
Wolfcamp10,721-7,963
AtokaATOKA - HIGH PRESSURE——
Pennsylvanian——
Strawn——

Perforations

Perforated and open-hole intervals.

FromToType
10,29517,701Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,09917.51,620 S
9.6254,27212.25281 S
710,9038.75520 S
4.517,8406.125773 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 17, 2020Feb 12, 2020—
00Aug 23, 2016Jul 22, 2016Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/30132649, documented in the API reference.