WELL · 42-301-32652 · DISTRICT 8
Hueso Salto State 55-2-48 Lov #2H
Loving County · Phantom (Wolfcamp) field · Horizontal
Hueso Salto State 55-2-48 Lov #2H (API 42-301-32652) is a horizontal well in Loving County operated by Shell Western E&P, completed December 23, 2015.
The RRC has issued one drilling permit, issued July 24, 2015, permitted to 12,000 ft.
Completion filings report 11 formation tops, including Delaware, Bell Canyon, Cherry Canyon, Brushy Canyon.
No lease production has been reported under this well’s leases.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Jan 4, 2021
- Permits on file
- 1,756
- Phone
- (832) 337-0694
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Shell Western E&P |
| Production reports | EOG Resources, Inc.through Apr 2026 |
| Latest permit | Shell Western E&PJul 24, 2015 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,000
- total depth, ft
- 1
- permits on file
- Jul 24, 2015
- last permit issued
- Dec 23, 2015
- completed
- 0
- cumulative oil, bbl
- 1.43M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2015 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 23, 2015
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| State Link VJ Ranch 37-48 G-10-287548 | Phantom (Wolfcamp) | EOG Resources, Inc. | 1 | 0 | 1.43M | Dec 2015 – Jul 2026 |
| Hueso Salto State 55-2-48 Lov O-10-47562 | Phantom (Wolfcamp) | Shell Western E&P | 1 | 0 | 0 | Dec 2015 – Mar 2020 |
Gas, mcf lease total
Last 12 months 91,325 · prior 12 92,599(-1%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Shell Western E&PDec 2015 → Mar 2021
- 2EOG Resources, Inc.Apr 2021 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 808065-99 | Drill | Shell Western E&P | Jul 2, 2015 | Jul 24, 2015 | Sep 11, 2015 | 12,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-10-287548 | — | — | — | — |
| — | — O-10-47562 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,746 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Delaware | 3,963 | -1,217 |
| Bell Canyon | 3,988 | -1,242 |
| Cherry Canyon | 4,933 | -2,187 |
| Brushy Canyon | 6,169 | -3,423 |
| Bone SpringBONE SPRINGS | 7,789 | -5,043 |
| Wolfcamp | 10,927 | -8,181 |
| AtokaATOKA - HIGH PRESSURE | — | — |
| Morrow | — | — |
| Pennsylvanian | — | — |
| Red Bluff | — | — |
| Strawn | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,565 | 15,763 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 1,250 | 17.5 | 1,446 S |
| 9.625 | 3,864 | 12.25 | 1,500 S |
| 7 | 11,493 | 8.75 | 820 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 12, 2025 | Oct 29, 2025 | — |
| 00 | Nov 26, 2019 | Aug 19, 2019 | Yes |
| 00 | May 11, 2016 | Mar 1, 2016 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-301-32652 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-301-32652 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/30132652, documented in the API reference.