WELL · 42-301-32686 · DISTRICT 8

Arno 78-TTT-B33 WF #202H

Y

Loving County · Phantom (Wolfcamp) field · Producing  · Horizontal

Arno 78-Ttt-B33 WF #202H (API 42-301-32686) is a horizontal well in Loving County operated by Matador Production Company, completed May 4, 2018 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued August 31, 2015, permitted to 12,000 ft.

Completion filings report 10 formation tops, including Red Bluff, Delaware, Bell Canyon, Cherry Canyon.

Its lease has reported 314K barrels of oil and 6.48M mcf of gas since June 2014, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Matador Production Company

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Sep 30, 2025
Permits on file
569
Phone
(972) 371-5200

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMatador Production Company
Production reportsMatador Production Companythrough Apr 2026
Latest permitMatador Production CompanyAug 31, 2015
12,000
total depth, ft
2
permits on file
Aug 31, 2015
last permit issued
May 4, 2018
completed
314K
cumulative oil, bbl
6.48M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2014 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 4, 2018
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Arno 78-TTT-B33 WF O-10-46141Phantom (Wolfcamp)Matador Production Company2314K6.48MJun 2014 – Jul 2026

Gas, mcf lease total

Last 12 months 212,619 · prior 12 274,453(-23%)

020K40K202420252026

Oil, barrels lease total

Last 12 months 9,605 · prior 12 13,519(-29%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Matador Production CompanyJun 2014 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
809618-98DrillMatador Production CompanyDec 13, 2016Aug 31, 2015Dec 23, 201612,000
809618-99DrillMatador Production CompanyAug 19, 2015Aug 31, 2015Dec 23, 201612,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-46141————

Formation tops

As filed on W-2/G-1. Subsea from 2,664 ft elevation.Download CSV →

FormationMD ftSubsea
Red Bluff1,5001,164
Delaware4,250-1,586
Bell Canyon4,278-1,614
Cherry Canyon5,191-2,527
Brushy Canyon6,454-3,790
Bone SpringBONE SPRINGS7,776-5,112
Wolfcamp10,594-7,930
AtokaATOKA - HIGH PRESSURE——
Pennsylvanian——
Strawn——
Wolfcamp——

Perforations

Perforated and open-hole intervals.

FromToType
11,11015,709Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,16517.51,185 S
9.6254,40012.25220 S
711,0968.75401 S
4.515,9236.125634 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 20, 2020Feb 18, 2020—
00Mar 4, 2020Nov 21, 2019Yes
00Feb 15, 2018Nov 30, 2017—
00Dec 21, 2017Sep 8, 2017Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/30132686, documented in the API reference.