TEXAS · WELLS · LOVING COUNTY · EXCELSIOR 7 LEASE · API 42-301-32709 · DISTRICT 7B

Excelsior 7 #12H

Y

Loving County · Phantom (Wolfcamp) field · Producing  · Horizontal

Excelsior 7 #12H (API 42-301-32709) is a horizontal well in Loving County operated by Eog Resources Inc., completed June 12, 2016 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued September 8, 2015, permitted to 12,190 ft.

Completion filings report 10 formation tops, including Bell Canyon, Delaware, Cherry Canyon, Brushy Canyon.

Its lease has reported 1.9M barrels of oil and 6.17M mcf of gas since September 2015, last reporting volume in April 2026. The lease carries 6 wells, so these are lease totals, not this well alone.

Operator of record

EOG Resources Inc.

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Oct 2, 2025
Permits on file
16,354
Phone
(713) 651-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEOG Resources Inc.
Production reportsEOG Resources, Inc.through Apr 2026
Latest permitEOG Resources, Inc.Sep 8, 2015
12,190
total depth, ft
2
permits on file
Sep 8, 2015
last permit issued
Jun 12, 2016
completed
1.9M
cumulative oil, bbl
6.17M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 2015 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 12, 2016
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 6 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Excelsior 7 O-10-47049Phantom (Wolfcamp)EOG Resources, Inc.61.9M6.17MSep 2015 – Apr 2026

Gas, mcf lease total

Last 12 months 283,680 · prior 12 229,707(+23%)

020K40K202420252026

Oil, barrels lease total

Last 12 months 24,540 · prior 12 31,663(-22%)

02K4K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1EOG Resources, Inc.Sep 2015 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
810055-98DrillEOG Resources, Inc.Jun 15, 2016Sep 8, 2015Jan 2, 201613,500
810055-99DrillEOG Resources, Inc.Sep 3, 2015Sep 8, 2015—13,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 12, 2016Excelsior 7 O-10-47049Phantom (Wolfcamp)EOG Resources Inc.Producing12,190

Formation tops

As filed on W-2/G-1. Subsea from 3,072 ft elevation.Download CSV →

FormationMD ftSubsea
Bell Canyon4,466-1,394
Delaware4,466-1,394
Cherry Canyon5,517-2,445
Brushy Canyon6,843-3,771
Bone SpringBONE SPRINGS8,655-5,583
Wolfcamp11,729-8,657
Ellenburger——
Fusselman——
Pennsylvanian——
Red Bluff——

Perforations

Perforated and open-hole intervals.

FromToType
12,36017,043Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7594514.75524 S
7.62510,9109.875740 S
5.517,2006.75805 S
517,2006.75805 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Apr 10, 2017Nov 1, 2016Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it. The University Lands library has no per-well link: then paste it into its search.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/30132709, documented in the API reference.