TEXAS · WELLS · LOVING COUNTY · NEELIE 1-85 LOV LEASE · API 42-301-32844 · DISTRICT 7B

Neelie 1-85 Lov #1H

Shut in

Loving County · Sandbar (Bone Spring) field · Shut In  · Horizontal

Neelie 1-85 Lov #1H (API 42-301-32844) is a horizontal well in Loving County operated by Pdeh LLC, completed July 10, 2016 and listed as shut in on the RRC schedule, shut in May 1, 2023.

The RRC has issued one drilling permit, issued January 21, 2016, permitted to 9,792 ft.

It was permitted by Shell Western E&P and has since transferred to Pdeh LLC on the wellbore schedule.

Completion filings report 10 formation tops, including Delaware, Bell Canyon, Cherry Canyon, Brushy Canyon.

Its lease has reported 92K barrels of oil and 280K mcf of gas since July 2016, last reporting in July 2026.

Operator of record

Pdeh LLC

Permitted by Shell Western E&P; the EWA schedule now lists a different operator.

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Dec 8, 2025
Permits on file
498
Phone
(432) 683-7443

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePdeh LLC
Production reportsPdeh LLCthrough Oct 2025
Latest permitShell Western E&PJan 21, 2016

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,792
total depth, ft
1
permits on file
Jan 21, 2016
last permit issued
Jul 10, 2016
completed
92K
cumulative oil, bbl
280K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2016 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 10, 2016
Shut in
May 1, 2023
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Neelie 1-85 Lov O-10-48039Sandbar (Bone Spring)Pdeh LLC192K280KJul 2016 – Jul 2026

Oil, barrels lease total

Last 12 months 86 · prior 12 0

050100202420252026

Gas, mcf lease total

Last 12 months 198 · prior 12 0

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Shell Western E&PJul 2016 → Aug 2021
  2. 2Pdeh LLCNov 2021 → Oct 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
813399-99DrillShell Western E&PJan 21, 2016Jan 21, 2016Feb 8, 201613,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 10, 2016Neelie 1-85 Lov O-10-48039Sandbar (Bone Spring)Pdeh LLCShut In · shut in May 1, 20239,792

Formation tops

As filed on W-2/G-1. Subsea from 2,738 ft elevation.Download CSV →

FormationMD ftSubsea
Delaware4,318-1,580
Bell Canyon4,340-1,602
Cherry Canyon5,322-2,584
Brushy Canyon6,463-3,725
Bone SpringBONE SPRINGS7,955-5,217
Wolfcamp10,794-8,056
AtokaATOKA - HIGH PRESSURE——
Pennsylvanian——
Red Bluff——
Strawn——

Perforations

Perforated and open-hole intervals.

FromToType
9,94214,089Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37595417.51,175 S
9.6254,20312.252,000 S
711,0908.75855 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 8, 2016Aug 29, 2016Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/30132844, documented in the API reference.