WELL · 42-301-33909 · DISTRICT 8
Clare Glassell 71-TTT-B01 WF #204H
Loving County · Phantom (Wolfcamp) field · Producing · Horizontal
Clare Glassell 71-Ttt-B01 WF #204H (API 42-301-33909) is a horizontal well in Loving County operated by Matador Production Company, completed June 27, 2019 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit (amended once), issued March 1, 2018, permitted to 11,500 ft.
Completion filings report 14 formation tops, including Red Bluff, Delaware, Bell Canyon, Cherry Canyon.
Its lease has reported 572K barrels of oil and 2.1M mcf of gas since August 2018, last reporting in July 2026.
Operator of record
Dallas, TX · P-5 Y, filed Jul 4, 2026 · 569 permits on file · (972) 371-5200
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Matador Production Company |
| Production reports | Matador Production Companythrough Apr 2026 |
| Latest permit | Matador Production CompanyMar 1, 2018 |
- 11,500
- total depth, ft
- 2
- permits on file
- Mar 1, 2018
- last permit issued
- Jun 27, 2019
- completed
- 572K
- cumulative oil, bbl
- 2.1M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2018 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jun 27, 2019
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
31.688385, -103.561668
OpenStreetMap → · Google Maps →
Permit surface location from the RRC GIS record, in Loving County.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Clare Glassell 71-TTT-B01 WF O-10-51663 | Phantom (Wolfcamp) | Matador Production Company | 1 | 572K | 2.1M | Aug 2018 – Jul 2026 |
Oil, barrels lease total
Last 12 months 39,109 · prior 12 37,877(+3%)
Gas, mcf lease total
Last 12 months 162,420 · prior 12 166,882(-3%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Matador Production CompanyAug 2018 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 836943-98 | Drill | Matador Production Company | Mar 1, 2018 | Mar 1, 2018 | Jun 11, 2018 | 11,500 |
| 836943-99 | Drill | Matador Production Company | Feb 28, 2018 | Mar 1, 2018 | Jun 11, 2018 | 11,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-51663 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,697 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Red Bluff | 1,000 | 1,697 |
| Delaware | 4,378 | -1,681 |
| Bell Canyon | 4,413 | -1,716 |
| Cherry Canyon | 5,561 | -2,864 |
| Brushy Canyon | 6,511 | -3,814 |
| Bone SpringBONE SPRINGS | 7,924 | -5,227 |
| Wolfcamp | 10,758 | -8,061 |
| AtokaATOKA - HIGH PRESSURE | — | — |
| Devonian | — | — |
| Ellenburger | — | — |
| Fusselman | — | — |
| Morrow | — | — |
| Pennsylvanian | — | — |
| Strawn | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,044 | 15,699 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 776 | 17.5 | 835 S |
| 10.75 | 4,486 | 12.25 | 145 S |
| 5.5 | 10,018 | 6.125 | 875 S |
| 7.625 | 10,199 | 9.875 | 755 S |
| 7 | 11,039 | 9.875 | 1,415 S |
| 4.5 | 15,855 | 6.125 | 875 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 22, 2020 | Feb 11, 2020 | Yes |
| 00 | Jun 28, 2019 | Mar 11, 2019 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-301-33909 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-301-33909 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
Nearby wells and their tops
NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM
Draw a cross-section
This well's tops beside its 5 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.
Seahawk42-301-37131
0.5 KM · Admiral Permian Operating LLC · Section with this well →
| Bell Canyon | 4,369 | -1,683 |
| Delaware | 4,369 | -1,683 |
| Cherry Canyon | 5,391 | -2,705 |
| Brushy Canyon | 6,548 | -3,862 |
| Bone Spring | 7,902 | -5,216 |
| Two Georges | 8,305 | -5,619 |
| Bone Spring | 8,872 | -6,186 |
| Red Bluff | — |
10 TOPS · FIRST 8
Seahawk42-301-37134
0.5 KM · Admiral Permian Operating LLC · Section with this well →
| Delaware | 4,370 | -1,684 |
| Bell Canyon | 4,370 | -1,684 |
| Cherry Canyon | 5,397 | -2,711 |
| Brushy Canyon | 6,544 | -3,858 |
| Bone Spring | 7,906 | -5,220 |
| Two Georges | 8,304 | -5,618 |
| Bone Spring | 8,874 | -6,188 |
| Bone Spring | — |
10 TOPS · FIRST 8
Seahawk42-301-37132
0.5 KM · Admiral Permian Operating LLC · Section with this well →
| Delaware | 4,373 | -1,687 |
| Bell Canyon | 4,373 | -1,687 |
| Cherry Canyon | 5,398 | -2,712 |
| Brushy Canyon | 6,549 | -3,863 |
| Bone Spring | 7,908 | -5,222 |
| Two Georges | 8,310 | -5,624 |
| Wolfcamp | — | |
| Strawn | — |
10 TOPS · FIRST 8
Seahawk42-301-37135
0.6 KM · Admiral Permian Operating LLC · Section with this well →
| Delaware | 4,374 | -1,689 |
| Bell Canyon | 4,374 | -1,689 |
| Bone Spring | 8,874 | -6,189 |
| Red Bluff | — | |
| Bone Spring | — | |
| Bone Spring | — | |
| Fusselman | — | |
| Precambrian (Undifferentiated) | — |
10 TOPS · FIRST 8
Jayhawk State Unit 65-6442-301-36195
0.7 KM · Greenlake Energy Operating, LLC · Section with this well →
| Rustler | 750 | 1,938 |
| Bone Spring | 7,891 | -5,203 |
| Wolfcamp | 10,773 | -8,085 |
| Cherry Canyon | — | |
| Delaware | — | |
| Pennsylvanian | — | |
| Red Bluff | — | |
| Strawn | — |
10 TOPS · FIRST 8
Jayhawk Unit 6542-301-36173
0.7 KM · Greenlake Energy Operating, LLC · Section with this well →
| Rustler | 750 | 1,939 |
| Bone Spring | 7,891 | -5,202 |
| Wolfcamp | 10,773 | -8,084 |
| Cherry Canyon | — | |
| Delaware | — | |
| Pennsylvanian | — | |
| Red Bluff | — | |
| Strawn | — |
11 TOPS · FIRST 8
Jayhawk State Unit 65-6442-301-36197
0.7 KM · Greenlake Energy Operating, LLC · Section with this well →
| Rustler | 750 | 1,938 |
| Bone Spring | 7,891 | -5,203 |
| Bone Spring | 8,222 | -5,534 |
| Bone Spring | 9,021 | -6,333 |
| Bone Spring | 9,325 | -6,637 |
| Bone Spring | 9,840 | -7,152 |
| Bone Spring | 10,161 | -7,473 |
| Wolfcamp | 10,773 | -8,085 |
15 TOPS · FIRST 8
Jayhawk Unit 6542-301-36174
0.7 KM · Greenlake Energy Operating, LLC · Section with this well →
| Rustler | 750 | 1,938 |
| Bone Spring | 7,891 | -5,203 |
| Bone Spring | 8,222 | -5,534 |
| Bone Spring | 9,021 | -6,333 |
| Bone Spring | 9,325 | -6,637 |
| Wolfcamp | 10,773 | -8,085 |
| Red Bluff | — | |
| Strawn | — |
14 TOPS · FIRST 8
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/30133909, documented in the API reference.